Precast Concrete Bridge Headwall Assembly Segmentation

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing precast reinforced concrete bridge units are heavy and cumbersome, making them difficult to transport and handle, especially when integrated with headwalls, which hinders efficient construction and shipping processes.

Innovation Solution

The precast concrete bridge and headwall assembly involves separately precasting headwalls with embedded anchor members and counterforts, allowing for a precision match and reduced weight, enabling easier handling and shipping by allowing the headwall to be detached and transported independently after curing.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Strength

If the headwall is cast as an integral part of the bridge unit, then the structural strength and stability are improved, but the weight and volume of the precast bridge unit increase significantly

Engineering Contradiction:
Improvestructural strengthVSAvoidweight of precast bridge unit
Core Design Contradiction:
StrengthVSWeight of moving object

Solution Approach 1:

The headwall is separated from the bridge unit into two independent precast components. The bridge unit includes a top wall with embedded anchor members, while the headwall is a separate element that can be transported and installed independently, reducing the weight of each individual component.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

Embedded anchor members are pre-installed in the top wall of the bridge unit during its precasting, and corresponding recesses are prepared in the headwall. These preliminary preparations enable quick and secure assembly at the construction site without requiring additional field fabrication or heavy lifting equipment.

Inventive Principle:
Principle #10Preliminary action

2Weight of moving object

If the headwall is precast separately from the bridge unit, then the weight and shipping cost are reduced, but the assembly precision and alignment difficulty increase

Engineering Contradiction:
Improveweight of bridge unitVSAvoidassembly precision
Core Design Contradiction:
Weight of moving objectVSManufacturing precision

Solution Approach 1:

Embedded anchor members in the bridge unit's top wall serve as intermediaries that precisely locate and secure the headwall during assembly. The anchor members extend into corresponding recesses in the headwall, providing automatic alignment and precise positioning without requiring complex field measurements or adjustments.

Inventive Principle:
Principle #24Intermediary (Mediator)

Solution Approach 2:

The top wall of the bridge unit is specifically designed with localized embedded anchor members at precise positions, and the headwall incorporates corresponding recesses at matching locations. This localized precision engineering at critical connection points ensures accurate assembly while allowing the rest of the components to be manufactured with standard tolerances.

Inventive Principle:
Principle #3Local quality

3Ease of operation

If the headwall is precast separately, then the handling and shipping convenience are improved, but the device complexity and assembly time increase

Engineering Contradiction:
Improvehandling convenienceVSAvoidassembly complexity
Core Design Contradiction:
Ease of operationVSDevice complexity

Solution Approach 1:

The bridge unit and headwall are connected through a simplified integration process where the headwall is positioned against the bridge unit and secured using embedded anchor members. This merging approach creates a unified structure that maintains the handling advantages of separate precasting while achieving the structural integrity of an integrated design.

Inventive Principle:
Principle #5Merging (Combining)

4Stability of the object's composition

If the continuous arcuate collar is used to attach the headwall, then the structural stability is improved, but the concrete volume and weight increase

Engineering Contradiction:
Improvestructural stabilityVSAvoidconcrete volume
Core Design Contradiction:
Stability of the object's compositionVSQuantity of substance

Solution Approach 1:

The continuous arcuate collar is replaced by extracting only the essential connection elements - embedded anchor members in the bridge unit and corresponding recesses in the headwall. This extraction eliminates the need for excessive concrete material while maintaining the structural stability required for headwall attachment.

Inventive Principle:
Principle #2Taking out (Extraction)

Data Source

PatentUS7556451B2Precast concrete bridge and headwall assembly and method of production
Publication Date: 2009.07.07 CONTECH ENGINEERED SOLUTIONS LLC
  • US7556451B2 patent drawing
  • US7556451B2 patent drawing
  • US7556451B2 patent drawing

AI summary

A precast steel reinforced concrete bridge unit has an arcuate top wall integrally connecting opposite side walls, and a series of precast reinforced concrete counterforts are releasably connected to the top wall of the bridge unit at laterally spaced intervals. The counterforts have vertical end surfaces spaced from an end surface of the bridge unit, and end portions of reinforcing bars project from the vertical end surfaces of the counterforts. An end surface of the bridge unit is located on a horizontal casting surface, and a reinforced concrete headwall is cast on the casting surface with the reinforcing bars depending from the counterforts embedded in the concrete forming the headwall. After curing, the concrete headwall and counterforts are removed as a unit from the bridge unit to facilitate handling and shipping of the bridge unit and headwall and counterfort unit.