Problem
In information processing systems, the time it takes to initiate desired processing through remote-control operation using a controller is prolonged due to the need for completing the logical layer connection process, which increases power consumption and delays in establishing a connection.
Innovation Solution
The system employs a method where the operation terminal generates physical and logical layer connection request signals to initiate a connection with the information processing unit, allowing it to start up and establish a connection more efficiently, reducing the time required for remote-control operation by prioritizing wireless communication during the start-up process.
Engineering Contradictions & Design Principles
Engineering Contradiction Analysis
1Reliability
If the system completes the full logical layer connection process before initiating processing, then connection reliability is improved, but the time to initiate processing is prolonged
Solution Approach 1:
The system performs preliminary actions by having the operation terminal send connection request signals (physical layer and logical layer) before the information processing unit is fully activated from standby state. The terminal prepares connection parameters and sends requests in advance, so that when the processing unit wakes up, the connection process can be quickly completed without waiting for the full startup sequence.
Solution Approach 2:
The connection process is segmented into distinct phases: physical layer connection request, physical layer connection enable signal, logical layer connection request, and logical layer connection enable signal. This segmentation allows the system to track and manage connection progress through different stages, enabling the terminal to send appropriate signals at the right time without requiring the processing unit to be fully operational.
2Use of energy by moving object
If the system remains in standby state with minimal power consumption, then energy efficiency is improved, but the startup response time increases
Solution Approach 1:
The operation terminal performs preliminary actions by maintaining readiness to send connection request signals while the information processing unit is in standby state. The terminal keeps its wireless transmitter and signal generation capabilities active, allowing it to immediately initiate the connection process when the processing unit wakes up, thus reducing startup response time without requiring the processing unit to consume additional power during standby.
Solution Approach 2:
The operation terminal acts as an intermediary that bridges the gap between the standby state and full operation. By maintaining connection request capabilities on the terminal side while the processing unit remains in low-power standby, the system achieves fast response times without compromising the energy efficiency of the processing unit during standby.
3Reliability
If the terminal repeatedly transmits logical layer connection request signals, then connection establishment reliability is improved, but wireless communication overhead increases
Solution Approach 1:
The terminal employs periodic transmission of logical layer connection request signals at predetermined intervals rather than continuous transmission. This periodic approach ensures that connection requests are sent regularly to maintain connection establishment reliability, while the intervals between transmissions reduce wireless communication overhead and energy consumption compared to continuous signaling.
Data Source
Figure 1
Figure 2
Figure 3
AI summary
This invention suppresses increase in power consumption and reduces the time it takes until a controller is usable when starting the operation of console main unit from the standby state by the controller through BT communication. When a console main unit 10 is started up from the standby state by a controller through BT communication, a main CPU 64 of the console main unit 10 reads in and runs a controller connection managing program after the BT driver is read-in and run. Upon reception of a logical layer connection request signal from the controller, the main CPU 64 stores that logical layer connection request signal in main memory 65, reads in and runs the controller connection managing program, reads in terminal identification information from the main memory 65, establishes a logical layer connection through BT communication, and makes a communication module 79 transmit a logical layer connection enable signal.