Building Asset Timeseries Correlation for Faster BMS Work Orders

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Building management systems (BMS) face delays in data presentation due to the need for raw timeseries data to be retrieved and processed in response to requests, which can hinder timely decision-making and resource utilization.

Innovation Solution

A system that monitors building assets for events, generates performance timeseries, and cross-correlates them to determine actionable insights, generating work-orders or performing operations based on these insights, thereby reducing the need for sequential processing and improving resource allocation.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Device complexity

If raw timeseries data is stored in a relational database without significant organization or processing at the time of data collection, then device complexity is reduced, but data presentation speed deteriorates due to sequential retrieval and processing requirements

Engineering Contradiction:
Improvedata storage complexityVSAvoiddata presentation speed
Core Design Contradiction:
Device complexityVSSpeed

Solution Approach 1:

The system performs preliminary processing of timeseries data by generating organized views and aggregations at the time of data collection rather than waiting for query-time processing. This allows the data to be pre-structured in ways that enable faster retrieval and presentation when needed, resolving the contradiction between simple storage and fast presentation.

Inventive Principle:
Principle #10Preliminary action

2Loss of information

If applications retrieve and process raw timeseries data in response to requests, then data freshness is improved, but productivity deteriorates due to delayed data presentation

Engineering Contradiction:
Improvedata freshnessVSAvoiddata presentation efficiency
Core Design Contradiction:
Loss of informationVSProductivity

Solution Approach 1:

The system pre-generates organized views of timeseries data at collection time, so that when applications need data, they can retrieve pre-processed information rather than performing sequential processing. This maintains data freshness while dramatically improving presentation efficiency.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system dynamically generates multiple views of the same timeseries data in advance, creating adaptable representations that can serve different application needs simultaneously. This allows fast retrieval of context-appropriate data without sacrificing freshness or requiring reprocessing.

Inventive Principle:
Principle #15Dynamics

3Measurement precision

If sequential processing is used to retrieve and generate views of timeseries data, then measurement precision is maintained, but loss of time increases due to processing delays

Engineering Contradiction:
Improvedata accuracyVSAvoidprocessing time
Core Design Contradiction:
Measurement precisionVSLoss of time

Solution Approach 1:

The system performs data processing and view generation in advance during data collection, maintaining full measurement precision through careful processing. When data is needed, the pre-computed views are immediately available, eliminating the time loss associated with sequential processing while preserving accuracy.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS11451408B2Building management system with timeseries based assurance services
Publication Date: 2022.09.20 TYCO FIRE & SECURITY GMBH
  • US11451408B2 patent drawing
  • US11451408B2 patent drawing
  • US11451408B2 patent drawing

AI summary

A building system for assurance services with timeseries, the building system including one or more memory devices configured to store instructions thereon that, when executed by one or more processors, cause the one or more processors to monitor a building asset for one or more events and generate a plurality of performance timeseries for the building asset based on the one or more events, determine an actionable insight for the building asset by cross-correlating the plurality of performance timeseries, and perform at least one of generating a work-order for the building asset based on the actionable insight and causing a display device of a user device to display the work-order or communicating with the building asset and causing the building asset to perform one or more operations based on the actionable insight.