Bulk Bin Drop Door Center Support Structure

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Large plastic bulk bin containers with drop doors experience bowing, buckling, or failure of hinge elements due to load transfer through gaps between the door and side wall, leading to displacement and damage.

Innovation Solution

A central support structure extending between the hinge elements connects the drop door to the side wall, transferring loads directly to the side wall and preventing inward movement of the door, thereby stabilizing the door and reducing stress on hinge components.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of manufacture

If a gap is formed between the drop door and side wall in the central area between hinge elements, then the door can be manufactured and assembled more easily, but loads applied to the top of the bulk bin cause bowing, buckling or displacement of the drop door and failure of hinge elements

Engineering Contradiction:
Improveease of manufactureVSAvoidreliability
Core Design Contradiction:
Ease of manufactureVSReliability

Solution Approach 1:

A central support structure is introduced as an intermediary element between the drop door and side wall. This support structure fills the central gap area and provides load transfer capability, allowing loads to be distributed to the side wall without causing door displacement or hinge failure, while maintaining the gap configuration for ease of manufacture

Inventive Principle:
Principle #24Intermediary (Mediator)

Solution Approach 2:

The support structure extends in a new dimensional direction (centrally between the hinges) rather than only at the hinge locations. This additional structural dimension provides load distribution capability while preserving the gap configuration for manufacturing simplicity

Inventive Principle:
Principle #17Another dimension (Dimensionality change)

2Force

If loads are transferred primarily to the hinge elements, then the hinge elements bear the full load, but this causes bowing, buckling or displacement of the drop door and failure or damage to the hinge elements

Engineering Contradiction:
ImproveforceVSAvoidstrength
Core Design Contradiction:
ForceVSStrength

Solution Approach 1:

The load transfer path is segmented into multiple locations: loads are now transferred to both the hinge elements and the side wall through the central support structure. This segmentation of load paths prevents concentration of forces on the hinges alone, distributing the stress to maintain structural strength

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The central support structure provides localized reinforcement in the central gap area, creating a region with enhanced load-bearing capacity. This local quality improvement allows the structure to handle loads without requiring strengthening of the entire door or hinge assemblies

Inventive Principle:
Principle #3Local quality

Data Source

PatentUS9296557B2Bulk container with center support between drop door and side wall
Publication Date: 2016.03.29 ORBIS CORP
  • US9296557B2 patent drawing
  • US9296557B2 patent drawing
  • US9296557B2 patent drawing

AI summary

A center support structure between a drop door and a side wall of a bulk bin container is provided. The center support structure can be an extension from a lower portion of the drop door contacting the side wall, or an extension of the side wall contacting a lower portion of the drop door.