Cash Handling Device Network for Change Order Fulfillment

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Businesses face inefficiencies in obtaining change orders due to limited cash handling devices and the lack of knowledge about which devices have the necessary denominations available for fulfillment, leading to inefficient searches and potential delays.

Innovation Solution

A system that allows users to set up online or at a cash handling device for immediate or future retrieval of specific paper cash and coin denominations, with a banking interface device determining availability and reserving denominations at the requested location or suggesting alternative devices if needed.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If multiple businesses use limited cash handling devices to obtain change orders, then the supply of cash handling devices is insufficient, but increasing the number of devices increases device complexity and cost

Engineering Contradiction:
Improvechange order fulfillment efficiencyVSAvoidcash handling device availability
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The patent combines multiple cash handling devices into a unified networked system where devices share information about their cash denominations through a communication network. This allows businesses to access change orders from any device in the network, effectively merging the capabilities of multiple devices into a single accessible resource pool, thereby resolving the contradiction between limited device supply and fulfillment efficiency.

Inventive Principle:
Principle #5Merging (Combining)

Solution Approach 2:

The patent introduces a central server or banking interface device as an intermediary that manages cash denomination information across the network. This intermediary collects, stores, and distributes real-time information about which cash handling devices have which denominations available, enabling efficient routing of change order requests without requiring direct peer-to-peer communication between devices, thus improving productivity without proportionally increasing device complexity.

Inventive Principle:
Principle #24Intermediary (Mediator)

2Reliability

If businesses search for cash handling devices with required denominations, then change order fulfillment is possible, but the search process is inefficient and time-consuming

Engineering Contradiction:
Improvechange order fulfillmentVSAvoidsearch time
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The patent implements preliminary action by having cash handling devices proactively report their cash denomination status to the central server in advance, before any change order request is made. The system maintains up-to-date information about which devices have which denominations available, so when a business needs change, the system can immediately query and route the request to the appropriate device without any search time, thereby eliminating loss of time while ensuring reliable fulfillment.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The patent establishes a feedback mechanism where cash handling devices continuously report their cash status (which denominations are available) back to the central server. This real-time feedback allows the system to make informed routing decisions for change order requests, ensuring that businesses are directed to devices that currently have the required denominations, thus guaranteeing fulfillment reliability without requiring time-consuming searches.

Inventive Principle:
Principle #23Feedback

3Reliability

If cash handling devices reserve denominations in advance, then change orders can be fulfilled reliably, but cash availability for other transactions may be reduced

Engineering Contradiction:
Improvechange order fulfillmentVSAvoidcash availability
Core Design Contradiction:
ReliabilityVSQuantity of substance

Solution Approach 1:

The patent applies dynamics by implementing a time-bound reservation system where reserved cash denominations are held for a specific duration (e.g., a few hours) before being automatically released back into circulation. This dynamic approach allows the system to guarantee change order fulfillment by reserving necessary denominations temporarily, while ensuring that cash is not permanently removed from circulation, thus maintaining overall cash availability for other transactions after the reservation period expires.

Inventive Principle:
Principle #15Dynamics

Data Source

PatentUS8276810B2Change orders
Publication Date: 2012.10.02 BANK OF AMERICA CORP
  • US8276810B2 patent drawing
  • US8276810B2 patent drawing
  • US8276810B2 patent drawing

AI summary

Method, apparatus and system for setting up withdrawal change orders online or at a cash handling device for immediately retrieval and/or future retrievals of paper cash and coin. The change order may include specific requested denominations of paper cash and/or coins. The change order may also include a specific location that the user wishes to retrieve the cash at. Upon authentication of the user at the requested cash handling device within the time-frame specified, the user may receive the change order requested automatically.