Casing Hanger Assembly Relocated to Cellar Floor

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing casing hangers cause shifting and cracking of cement in well casings due to weight and vibrations during drilling, leading to well fluid migration and contamination of soil and groundwater.

Innovation Solution

A casing hanger assembly that is not part of the wellhead assembly, secured to the floor of a containment well cellar, distributing the weight of the casings and drilling forces over a larger area, preventing cement shifting and ensuring cement integrity.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Force

If existing casing hangers are used to suspend the weight of inner casing on outer casing, then the casing weight is supported, but the cement cracks and shifts due to concentrated weight and vibrations

Engineering Contradiction:
Improvecasing weight supportVSAvoidcement integrity
Core Design Contradiction:
ForceVSStability of the object's composition

Solution Approach 1:

The casing hanger is extracted from the wellhead assembly and repositioned to the cellar floor, separating the weight-bearing function from the wellhead components. This allows the cement to remain intact while still supporting the casing weight through the cellar floor distribution

Inventive Principle:
Principle #2Taking out (Extraction)

Solution Approach 2:

The weight distribution is transitioned from a point-contact support (existing hanger on casing) to a surface-area support (cellar floor). The hanger distributes weight over the first area of the cellar floor, changing the dimensional approach from linear to areal distribution

Inventive Principle:
Principle #17Another dimension (Dimensionality change)

2Ease of operation

If weight is supported by partially cured cement, then the wellhead assembly can be attached, but the cement cracks and containment is broken

Engineering Contradiction:
Improvewellhead assembly installationVSAvoidcontainment integrity
Core Design Contradiction:
Ease of operationVSReliability

Solution Approach 1:

The casing hanger function is extracted from the wellhead assembly and relocated to the cellar floor, eliminating the need for partially cured cement to bear the wellhead assembly weight. This separates the wellhead installation process from the cement curing requirement

Inventive Principle:
Principle #2Taking out (Extraction)

Solution Approach 2:

The cellar floor acts as an intermediary structure between the casing weight and the ground, providing a stable support surface that does not rely on cement curing. This intermediary allows wellhead assembly installation without compromising containment integrity

Inventive Principle:
Principle #24Intermediary (Mediator)

3Stability of the object's composition

If casing hanger is secured to the cellar floor distributing weight over a larger area, then cement integrity is maintained, but the device complexity increases

Engineering Contradiction:
Improvecement integrityVSAvoidhanger assembly structure
Core Design Contradiction:
Stability of the object's compositionVSDevice complexity

Solution Approach 1:

The hanger assembly is segmented into distinct functional components: the hanger body that engages the casing, the weight distribution interface with the cellar floor, and the wellhead assembly interface. This modular segmentation allows each component to perform its specific function while maintaining overall simplicity

Inventive Principle:
Principle #1Segmentation

Data Source

PatentUS10513914B1Casing hanger assembly
Publication Date: 2019.12.24 NAT OILWELL VARCO LP
  • US10513914B1 patent drawing
  • US10513914B1 patent drawing
  • US10513914B1 patent drawing

AI summary

A casing hanger assembly includes a landing ring secured to a containment well cellar or the conductor pipe. A casing hanger welded to the external surface of the last section of surface casing seats into the landing ring. Optionally, a lock down mechanism can be used to prevent buoyancy and hydraulic forces from causing the well to pack off.