Centralized Task Repository Architecture for Distributed Project Management

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing task and project management software is static, leading to costly and time-consuming user training, limited integration with other tools, and inefficient management of dynamic organizational processes, resulting in siloed use and large, cumbersome project files that require manual replication and synchronization.

Innovation Solution

A system with a generic architecture for managing tasks and artifacts using shared structures and a central repository, enabling flexible and adaptable task models, automatic modification of related tasks and artifacts, and optimized caching for improved responsiveness and efficiency.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If task and project management software uses static data structures with replication for multiple instances, then data integrity is maintained, but file size becomes large and synchronization becomes complex

Engineering Contradiction:
Improvedata integrityVSAvoidfile management complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The patent merges multiple project file instances into a single centralized repository, where all projects reference shared task templates and data structures. This eliminates the need to replicate files for each project instance, reducing file management complexity while maintaining data integrity through centralized control and versioning.

Inventive Principle:
Principle #5Merging (Combining)

Solution Approach 2:

The patent creates universal task templates that can be instantiated across multiple projects. A single template definition serves multiple purposes: it defines the structure for new projects, provides a blueprint for replication, and enables consistent data organization across the entire project portfolio, eliminating redundant file structures.

Inventive Principle:
Principle #6Universality (Multi-functionality)

2Adaptability or versatility

If task management software is delivered as standalone application, then software functionality is complete, but user training cost and time increase

Engineering Contradiction:
Improvesoftware functionalityVSAvoidtraining time
Core Design Contradiction:
Adaptability or versatilityVSLoss of time

Solution Approach 1:

The patent integrates task management software into existing collaboration platforms like Microsoft Office 365, making the software accessible through familiar interfaces. Users leverage existing platform knowledge and workflows, eliminating the need for separate training while maintaining complete task management functionality through the integrated system.

Inventive Principle:
Principle #6Universality (Multi-functionality)

Solution Approach 2:

The patent uses existing collaboration platforms as intermediaries between users and task management functionality. These platforms serve as familiar interfaces that users already know, mediating access to project management features without requiring users to learn new standalone application interfaces.

Inventive Principle:
Principle #24Intermediary (Mediator)

3Adaptability or versatility

If project files are replicated for multiple instances, then each project has independent data structure, but file size becomes large and modifications require individual updates

Engineering Contradiction:
Improveproject independenceVSAvoidfile size
Core Design Contradiction:
Adaptability or versatilityVSQuantity of substance

Solution Approach 1:

The patent combines multiple project instances into a unified repository structure where shared task templates and data structures are stored once centrally. Each project references these shared elements rather than containing duplicate copies, dramatically reducing total file size while allowing projects to maintain their own instance data and configurations.

Inventive Principle:
Principle #5Merging (Combining)

Solution Approach 2:

The patent segments project data into two categories: shared template definitions stored once in the centralized repository, and instance-specific data stored separately for each project. This segmentation allows projects to be independent in their operational data while sharing common structural definitions, reducing redundancy.

Inventive Principle:
Principle #1Segmentation

Data Source

PatentUS8549520B2Distributed task handling
Publication Date: 2013.10.01 SAP SE
  • US8549520B2 patent drawing
  • US8549520B2 patent drawing
  • US8549520B2 patent drawing

AI summary

Various embodiments described herein provide systems, methods, software, and data structures that may be used in distributed task handling. Some embodiments include a generic architecture for loosely coupled associations of globally managed tasks and artifacts within user defined task descriptions. As a result, such embodiments provide a flexible and adaptable task model.