Semiconductor Chamber Wall Temperature Control

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

In semiconductor manufacturing, particles or byproducts deposited on chamber walls can affect the performance of semiconductor processes, leading to issues such as reduced wafer uniformity and contamination.

Innovation Solution

A semiconductor manufacturing system with a control device and heating element that adjusts the temperature of the chamber walls to prevent particle deposition by controlling the inlet valve and water flow, using a pulse width modulation signal to manage the heating element's output power, and incorporating a recycle pipe to conserve water and reduce power consumption.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Manufacturing precision

If water flow is continuously maintained to prevent particle deposition on chamber walls, then manufacturing precision is improved, but loss of substance (water) increases

Engineering Contradiction:
Improvewafer uniformityVSAvoidwater consumption
Core Design Contradiction:
Manufacturing precisionVSLoss of substance

Solution Approach 1:

The system implements periodic water flow cycles alternating between high flow rate (during semiconductor processing) and low flow rate (during idle periods). The control device switches between these flow rates based on chamber activity detection, thereby maintaining particle prevention effectiveness while significantly reducing overall water consumption during non-processing times.

Inventive Principle:
Principle #19Periodic action

Solution Approach 2:

The water flow rate is dynamically adjusted based on real-time detection of chamber activity. The control device monitors whether the chamber is actively processing or idle, and automatically adjusts the water flow rate accordingly - high flow during processing to prevent particle deposition, low flow during idle periods to conserve water, thus adapting the system behavior to current operational needs.

Inventive Principle:
Principle #15Dynamics

2Reliability

If heating element operates continuously to maintain chamber wall temperature, then particle deposition is prevented, but use of energy increases

Engineering Contradiction:
Improveparticle deposition preventionVSAvoidpower consumption
Core Design Contradiction:
ReliabilityVSUse of energy by stationary object

Solution Approach 1:

The heating element operates in periodic cycles rather than continuously. During active semiconductor processing, the heating element maintains elevated chamber wall temperatures to prevent particle deposition. During idle periods between processing cycles, the heating element reduces or stops operation, significantly reducing energy consumption while maintaining reliability during actual processing operations.

Inventive Principle:
Principle #19Periodic action

Solution Approach 2:

The heating element's power output is dynamically controlled based on chamber activity detection. The control device adjusts the heating element operation in real-time - full power during processing to ensure particle-free walls, reduced or zero power during idle periods to minimize energy consumption, thereby optimizing the balance between particle prevention reliability and energy usage.

Inventive Principle:
Principle #15Dynamics

3Manufacturing precision

If high water flow rate is maintained to prevent particle deposition, then manufacturing precision is improved, but use of energy increases

Engineering Contradiction:
Improvewafer uniformityVSAvoidwater pump energy
Core Design Contradiction:
Manufacturing precisionVSUse of energy by moving object

Solution Approach 1:

The water pump operates at high flow rate periodically during active processing to maintain particle-free chamber walls and ensure manufacturing precision. During idle periods between processing cycles, the pump operates at low flow rate or stops completely, significantly reducing the energy consumption of the water pump while maintaining precision during actual production operations.

Inventive Principle:
Principle #19Periodic action

Solution Approach 2:

The water pump's flow rate is dynamically adjusted based on real-time chamber activity detection. The control device monitors processing status and automatically varies the pump output - high flow rate during processing to prevent particle deposition and maintain wafer uniformity, low or zero flow rate during idle periods to minimize pump energy consumption, optimizing the trade-off between manufacturing precision and energy usage.

Inventive Principle:
Principle #15Dynamics

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

Prevents particle deposition on chamber walls, maintains wafer uniformity, conserves water, and reduces power consumption by optimizing water flow and heating element usage based on chamber activity.

Implementation Method 1

a heating element disposed in the inner space of the wall and configured to heat the wall

Methodology Applied
Scientific EffectHeating: Heating

Implementation Method 2

When the controller closes the output port of the chamber and opens the inlet valve, water from the supply pipe flows into the wall of the chamber through the inlet valve first and then flows into the recycle pipe

Methodology Applied
Scientific EffectHeat transfer: Conduction (thermal)

Data Source

PatentUS11443959B2Semiconductor manufacturing system and control method
Publication Date: 2022.09.13 TAIWAN SEMICONDUCTOR MANUFACTURING CO LTD
  • US11443959B2 patent drawing
  • US11443959B2 patent drawing
  • US11443959B2 patent drawing

AI summary

A system includes a chamber, an inlet valve, a control device, and a recycle pipe. The chamber is configured to perform a semiconductor process and including an output port. The inlet valve is coupled to the chamber and a supply pipe. The controller is coupled to the inlet valve and the chamber. The recycle pipe arranged outside the chamber and coupled to the chamber. The recycle pipe is independent from the supply pipe. The controller is configured to determine whether the chamber is idle, and is configured to control the inlet valve based on the determination of whether the chamber is idle. When the controller closes the output port of the chamber and opens the inlet valve, water from the supply pipe flows into a wall of the chamber through the inlet valve first and then flows into the recycle pipe.