CHP Installation With Power Lock-Out for Safe Grid Integration

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

The installation of combined heat and power (CHP) systems in single-family homes poses challenges, particularly in retrofitting, where the separation of heat and power connections requires specialized competency, leading to safety risks and inefficiencies, as unqualified individuals may attempt to install the power generation feature, and utilities need assurance of proper grid integration for safe and effective operation.

Innovation Solution

Incorporating a mechanical or electrical 'power lock-out' feature in the CHP system that prevents immediate operation of the power generation mode, allowing a qualified HVAC installer to initially connect the system, while a certified electrician completes the power generation integration, ensuring safe and proper installation, with modes of operation including 'grid-tied' and 'off-grid' capabilities.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If the CHP system allows immediate operation of power generation mode after installation, then the system can be quickly operational, but unqualified individuals may attempt installation leading to safety risks and improper grid integration

Engineering Contradiction:
Improveinstallation safetyVSAvoidinstallation accessibility
Core Design Contradiction:
ReliabilityVSEase of operation

Solution Approach 1:

The patent implements a power lock-out feature that is activated by default upon installation, preventing the power generation mode from operating until a certified electrician explicitly enables it. This preliminary safety measure ensures that even if the system is physically installed, it cannot generate power unless proper qualifications are verified, thus preventing unsafe operation while allowing the physical installation to proceed

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The patent introduces a utility company as an intermediary in the power generation enablement process. The system requires coordination with the utility company through a two-way communication protocol to verify proper grid integration before allowing power generation. This intermediary layer ensures that unqualified installations cannot inadvertently connect to the grid, maintaining safety while enabling operational flexibility

Inventive Principle:
Principle #24Intermediary (Mediator)

2Reliability

If the system requires coordination with utility company for grid integration, then proper safety and billing arrangements are ensured, but the installation process becomes more complex and time-consuming

Engineering Contradiction:
Improvegrid integration safetyVSAvoidinstallation process complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The patent implements an automated verification system where the CHP system itself performs the coordination with the utility company through embedded communication protocols. The system automatically exchanges signals with the utility company to verify grid integration status, eliminating the need for manual verification processes and reducing installation complexity while maintaining safety requirements

Inventive Principle:
Principle #25Self-service

Solution Approach 2:

The patent establishes a two-way communication feedback loop between the CHP system and the utility company. The system continuously monitors grid integration status and receives feedback from the utility company regarding safety and billing arrangements. This automated feedback mechanism ensures proper coordination without requiring complex manual intervention, simplifying the installation process while maintaining reliability

Inventive Principle:
Principle #23Feedback

3Reliability

If the power lock-out feature is implemented, then unsafe power generation is prevented, but the system cannot provide power generation benefits immediately after installation

Engineering Contradiction:
Improvepower generation safetyVSAvoidtime to operational readiness
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The patent enables the heat generation portion of the CHP system to operate immediately after installation while the power lock-out remains in place. This allows the system to provide immediate heating benefits to the homeowner, while the power generation capability is prepared but restricted until utility coordination is complete, thus reducing the time loss by allowing partial operational readiness

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The patent implements a dynamic operational state where the system transitions from a heat-only mode to a combined heat and power mode once utility coordination is complete. The power lock-out feature is not permanent but dynamically adjustable based on verification status, allowing the system to adapt its functionality over time and provide benefits progressively rather than all-or-nothing

Inventive Principle:
Principle #15Dynamics

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

This solution enables safe and effective installation of CHP systems by preventing unsafe power generation until a qualified electrician completes the necessary connections, ensuring grid-quality power and compliance with utility requirements, thereby reducing installation risks and enhancing efficiency.

Implementation Method 1

The steam exhausted from the boiler can be used to drive a turbine in turn driving a generator

Methodology Applied
Scientific EffectSteam turbine: Turbine

Implementation Method 2

a turbine in turn driving a generator. The steam exhausted from the turbine can provide further water heating. Electric power from the turbine and generator

Methodology Applied
Scientific EffectElectromagnetic induction: Electromagnetic Induction

Data Source

PatentUS11041631B2Installation of combined heat and power systems
Publication Date: 2021.06.22 AVERILL PARTNERS LLC
  • US11041631B2 patent drawing
  • US11041631B2 patent drawing
  • US11041631B2 patent drawing

AI summary

A combined heat and power (CHP) system is installed with a power lock-out feature preventing flow of heated working fluid to an expander driving a generator generating electrical power until installation by a licensed person is completed, whereby heat can be provided to a building substantially immediately after installation of the CHP system, while power generation can be deferred until convenient.