Climbing Formwork–Elevator Integration for Crane-Free Vertical Lifting

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing building site elevators require the use of lifting cranes and manual raising of supporting structures for each elevation, which is inefficient and costly.

Innovation Solution

Integrate an elevator system with a vertically movable elevator machine platform that is connected to or suspended from a climbing formwork platform, allowing it to ascend jointly with the formwork platform without additional supporting structures, using winches, ropes, or chains with deflection pulleys for variable length lifting.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Device complexity

If a traditional building site elevator with separate supporting structures is used, then the elevator can be installed independently, but additional supporting structures and lifting cranes are required for each elevation, increasing device complexity and installation cost

Engineering Contradiction:
Improvenumber of supporting structuresVSAvoidinstallation cost
Core Design Contradiction:
Device complexityVSEase of manufacture

Solution Approach 1:

The patent combines the elevator supporting structures with the climbing formwork platform, integrating two previously separate systems into one unified structure. The elevator machine platform is suspended from the climbing formwork platform, eliminating the need for separate supporting structures and reducing overall device complexity while lowering installation costs.

Inventive Principle:
Principle #5Merging (Combining)

2Productivity

If manual raising of supporting structures is performed for each elevation, then the elevator can be positioned at different levels, but the process is time-consuming and reduces productivity

Engineering Contradiction:
Improveelevator installation efficiencyVSAvoidtime for raising supporting structures
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

The climbing formwork platform continuously ascends with the building construction, and the elevator machine platform is suspended from it, allowing the elevator to automatically reach different elevations without interruption. This eliminates the need for repeated manual raising operations and maintains continuous productive action.

Inventive Principle:
Principle #20Continuity of useful action

Solution Approach 2:

The elevator machine platform is preliminarily suspended from the climbing formwork platform at a lower elevation, and as the formwork platform ascends with each construction stage, the elevator platform is automatically raised to the next elevation without requiring separate raising operations.

Inventive Principle:
Principle #10Preliminary action

3Ease of operation

If lifting cranes are used for each elevation, then the elevator can be raised to required heights, but the process increases operational complexity and cost

Engineering Contradiction:
Improveelevator raising operationVSAvoidnumber of lifting cranes
Core Design Contradiction:
Ease of operationVSDevice complexity

Solution Approach 1:

The climbing formwork platform serves multiple functions: it acts as both the construction formwork and the supporting structure for the elevator machine platform. This multi-functional design eliminates the need for separate lifting cranes and simplifies operational procedures.

Inventive Principle:
Principle #6Universality (Multi-functionality)

4Area of stationary object

If separate supporting structures are used for each elevation, then the elevator can be installed, but space utilization is reduced due to additional structural elements

Engineering Contradiction:
Improvespace utilization in elevator shaftVSAvoidnumber of supporting structures
Core Design Contradiction:
Area of stationary objectVSDevice complexity

Solution Approach 1:

The elevator machine platform is nested within or suspended from the climbing formwork platform structure, allowing the elevator system to occupy the same vertical space as the construction platform without requiring additional horizontal space for separate supporting structures.

Inventive Principle:
Principle #7Nested doll (Nesting)

Data Source

PatentUS12410625B2Building site device having a climbing formwork and an elevator system
Publication Date: 2025.09.09 INVENTIO AG
  • US12410625B2 patent drawing
  • US12410625B2 patent drawing
  • US12410625B2 patent drawing

AI summary

A building site device includes a climbing formwork platform for the floor-by-floor production of concreting portions of a building core having at least one elevator shaft. An elevator system has an elevator machine platform vertically movable in the elevator shaft. In order to minimize the use of lifting cranes and the manual raising of supporting structures, the elevator machine platform can be moved jointly with the climbing formwork platform.