Constraint-Based Cloud Upgrades With Health-Gated Rollback

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Managing software and hardware deployments is complex due to interdependencies and data migrations, which can break services and impact data integrity during version upgrades.

Innovation Solution

A system that obtains a current deployment status from logs, transmits it to a central upgrade server, and receives tasks compliant with a target deployment state after passing constraint checks, allowing controlled upgrades with version compatibility and health constraints.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Adaptability or versatility

If version upgrade is implemented to improve deployment functionality, then product capabilities are enhanced, but service interdependencies may be broken and deployment reliability deteriorates

Engineering Contradiction:
Improveproduct capabilitiesVSAvoidservice interdependencies
Core Design Contradiction:
Adaptability or versatilityVSReliability

Solution Approach 1:

The system performs constraint checks before executing upgrade tasks to identify potential compatibility issues and dependencies in advance. This preliminary validation prevents breaking service interdependencies by ensuring that upgrade prerequisites are met before changes are applied.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system continuously monitors deployment health status and provides feedback to determine whether to proceed with, pause, or rollback upgrades. This feedback mechanism maintains reliability by adapting upgrade execution based on real-time system state and dependency satisfaction.

Inventive Principle:
Principle #23Feedback

2Reliability

If data migration is performed to improve schema compatibility, then data integrity is enhanced, but deployment downtime increases

Engineering Contradiction:
Improvedata integrityVSAvoiddeployment downtime
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The system evaluates migration constraints and prepares migration plans before actual data migration begins. This preliminary preparation identifies potential downtime requirements and allows for scheduling migrations during maintenance windows, minimizing unexpected deployment interruptions.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system dynamically adjusts migration execution based on real-time constraints and system state. Migration tasks can be paused, resumed, or rolled back based on monitoring feedback, allowing flexible time management that minimizes overall deployment downtime while ensuring data integrity.

Inventive Principle:
Principle #15Dynamics

3Reliability

If constraint checks are performed to improve upgrade safety, then deployment reliability is enhanced, but upgrade process complexity increases

Engineering Contradiction:
Improveupgrade safetyVSAvoidupgrade process
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The constraint checking process is divided into separate, modular evaluation steps that assess different aspects of upgrade safety independently. This segmentation makes the complex constraint verification process more manageable and systematic, reducing overall process complexity while maintaining comprehensive safety checks.

Inventive Principle:
Principle #1Segmentation

4Reliability

If deployment status monitoring is implemented to maintain health constraints, then deployment reliability is improved, but system complexity increases

Engineering Contradiction:
Improvedeployment healthVSAvoidmonitoring system
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The deployment system monitors its own health status and automatically makes decisions about upgrade execution based on monitored constraints. This self-service monitoring reduces the need for external complex monitoring infrastructure while maintaining reliable health checking through built-in status reporting and constraint evaluation.

Inventive Principle:
Principle #25Self-service

Data Source

PatentUS12487812B2Constraint-based upgrade and deployment
Publication Date: 2025.12.02 PALANTIR TECHNOLOGIES INC
  • US12487812B2 patent drawing
  • US12487812B2 patent drawing
  • US12487812B2 patent drawing

AI summary

One or more software products/services may be installed on a cloud deployment. Product versions of such services can be upgraded (or rolled back) based on a deployment plan comprising tasks adapted to reach a target deployment state. A central upgrade server can forward tasks to an upgrade agent for execution, the tasks being based on a current operational state of the cloud deployment (obtained by the upgrade agent) and one or more constraints. In multiple node deployments, some nodes may be upgraded to a new product version, while other nodes are kept at a current product version until stability of the new product version is determined. Traffic across nodes can be shaped to ensure a deployment is healthy before upgrading other nodes/deployments. If the health of a node/deployment does not meet specified criteria, an upgrade can be stopped, an alert can be triggered, and the node/deployment can be rolled back.