Cluster Control Plane On-Demand Activation for Idle Energy Savings

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing cluster infrastructures face inefficiencies in cost and energy consumption due to continuous operation of the control plane even when there are no active workloads, leading to reduced availability and increased overhead.

Innovation Solution

Implementing a demand-based activation mechanism that transitions the cluster infrastructure to a stopped state when no requests are detected, using snapshot techniques to maintain runtime consistency and enable rapid reactivation upon service demand, with the control plane scaling to zero utilization.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If the control plane operates continuously to ensure service availability, then service responsiveness is maintained, but energy consumption and operational costs increase

Engineering Contradiction:
Improveservice availabilityVSAvoidenergy consumption
Core Design Contradiction:
ReliabilityVSUse of energy by moving object

Solution Approach 1:

The control plane transitions from a static continuous operation state to a dynamic state that adapts based on workload conditions. The system monitors workload presence and automatically switches between active and suspended states, making the control plane's operational state flexible and adaptive rather than fixed, thereby resolving the contradiction between continuous availability and energy consumption.

Inventive Principle:
Principle #15Dynamics

Solution Approach 2:

The system changes the operational parameter of the control plane from constant activation to conditional activation based on workload detection. By monitoring workload parameters and adjusting the control plane's operational state accordingly, the system optimizes the balance between service availability and energy consumption through parameter-based control.

Inventive Principle:
Principle #35Parameter changes

2Loss of energy

If the control plane is suspended to reduce costs, then energy efficiency improves, but service responsiveness deteriorates

Engineering Contradiction:
Improveenergy efficiencyVSAvoidservice responsiveness
Core Design Contradiction:
Loss of energyVSReliability

Solution Approach 1:

The system performs preliminary actions by maintaining the ability to quickly reactivate the control plane through snapshot restoration. Before suspending the control plane, the system ensures that workload state snapshots are available, enabling rapid restoration and minimizing service interruption, thus maintaining energy efficiency while preserving service responsiveness.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system implements feedback mechanisms by monitoring workload presence and detecting when workloads are submitted. This feedback loop triggers automatic control plane reactivation, ensuring that service responsiveness is maintained through real-time monitoring and adaptive response to workload conditions.

Inventive Principle:
Principle #23Feedback

3Quantity of substance

If the control plane scales to zero utilization, then resource overhead is reduced, but system complexity increases due to state management requirements

Engineering Contradiction:
Improveresource utilizationVSAvoidstate management complexity
Core Design Contradiction:
Quantity of substanceVSDevice complexity

Solution Approach 1:

The system uses snapshot copying to preserve control plane state rather than maintaining complex state management mechanisms. By creating snapshots of the control plane state before suspension and restoring these copies upon reactivation, the system simplifies state management while enabling zero-utilization scaling, thus reducing resource overhead without proportionally increasing system complexity.

Inventive Principle:
Principle #26Copying

4Loss of time

If the control plane remains active during idle periods, then rapid service resumption is achieved, but cost efficiency decreases

Engineering Contradiction:
Improveservice resumption timeVSAvoidcost efficiency
Core Design Contradiction:
Loss of timeVSLoss of energy

Solution Approach 1:

The system performs preliminary state capture through snapshots during active periods, preparing the control plane for rapid restoration without maintaining continuous operation. This preliminary action enables quick service resumption by having state information ready beforehand, achieving fast recovery without the continuous energy consumption of keeping the control plane permanently active.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS12386646B2Cluster infrastructure with on-demand activation
Publication Date: 2025.08.12 RED HAT LLC
  • US12386646B2 patent drawing
  • US12386646B2 patent drawing
  • US12386646B2 patent drawing

AI summary

A request is received over a network. The request is directed to a service provided by an application of a cluster infrastructure. The cluster infrastructure includes the application and a control plane to schedule execution of the application. Responsive to receiving the request, the control plane of the cluster infrastructure is transitioned from a stopped state to an active state. The request is transferred to the cluster infrastructure.