Coil Tubing Tower Structure Modular Assembly

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Conventional coil structure units are time-consuming and crane-dependent, requiring simultaneous well control equipment assembly and numerous crane operations, leading to delays and increased costs.

Innovation Solution

A coil tubing tower structure with 50-foot intermediate units, integrated well control equipment, and a telescoping hoisting system that allows craneless assembly and operation, enabling faster and more efficient tool deployment and maintenance.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of manufacture

If conventional coil structure units are assembled using cranes with 9-foot sections, then the structure can be built section by section, but the assembly process becomes extremely time-consuming and crane-dependent

Engineering Contradiction:
Improveassembly processVSAvoidassembly time
Core Design Contradiction:
Ease of manufactureVSLoss of time

Solution Approach 1:

The tower structure is divided into modular intermediate units, each comprising a platform and crossbracing assembly. These standardized modules can be pre-assembled and then quickly connected to the base and to each other, reducing on-site assembly time while maintaining structural integrity

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

Components such as platform brackets, crossbracing, and well control equipment are pre-positioned and integrated into the intermediate units before delivery to the well site. This preliminary assembly eliminates the need for time-consuming crane operations during final installation

Inventive Principle:
Principle #10Preliminary action

2Adaptability or versatility

If well control equipment is installed on each intermediate unit, then operational capability is improved, but the complexity of assembly increases

Engineering Contradiction:
Improveoperational capabilityVSAvoidassembly complexity
Core Design Contradiction:
Adaptability or versatilityVSDevice complexity

Solution Approach 1:

Well control equipment is integrated directly onto the intermediate units during manufacturing, combining the platform structure with functional equipment. This merging reduces the number of separate installation steps and crane operations needed, as entire equipped modules are installed as single units

Inventive Principle:
Principle #5Merging (Combining)

Solution Approach 2:

The intermediate units are designed as universal modules that can accommodate various well control equipment configurations. Each unit serves multiple functions: structural support, equipment mounting, and operational control, reducing the need for specialized components

Inventive Principle:
Principle #6Universality (Multi-functionality)

3Productivity

If the tower structure uses longer intermediate units of 50 feet, then the number of sections and connections is reduced, but the handling and installation difficulty increases

Engineering Contradiction:
Improveassembly speedVSAvoidhandling ease
Core Design Contradiction:
ProductivityVSEase of operation

Solution Approach 1:

The intermediate units are designed with flexible connection points and adjustable mounting mechanisms that adapt to varying installation conditions. This dynamic design allows long 50-foot units to be easily positioned and secured without requiring precise pre-alignment, maintaining ease of operation despite increased length

Inventive Principle:
Principle #15Dynamics

Data Source

PatentUS12031391B2Coil structure
Publication Date: 2024.07.09 LYNCHPIN TECH (CAYMAN) LTD
  • US12031391B2 patent drawing
  • US12031391B2 patent drawing
  • US12031391B2 patent drawing

AI summary

A coil structure unit comprises a base and a tower structure, the tower structure comprises a plurality of intermediate units. The length of each of the plurality of intermediate sections can be about 50 feet. The length allows to utilize a manipulator that allows equipment such as lubricators and blowout preventers to be integral to the loads which will eliminate much of the rig up time and complication as well as having much more flexibility in operations to take the items on and off hole.