Composite Railcar Floor With Integrated Drain Pan

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current railcar floor designs require additional components and maintenance for drainage, leading to increased complexity, potential leaks, and labor-intensive sealing, which can result in debris accumulation and difficulty in loading/unloading commodities.

Innovation Solution

A composite railcar floor assembly with an integrated drain pan, eliminating the need for separate drainage components and sealing materials, by forming the drain pan as a recessed portion during primary floor construction, thus reducing design complexity and maintenance.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If a separate drain pan is installed in the railcar floor, then liquid collection capability is provided, but device complexity and maintenance requirements increase

Engineering Contradiction:
Improveliquid collection capabilityVSAvoiddrainage system complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The drain pan is merged with the primary floor structure to form an integrated composite floor assembly. The drain pan is formed as a recessed portion of the primary floor, eliminating the need for separate drain pan installation and reducing overall system complexity while maintaining liquid collection capability.

Inventive Principle:
Principle #5Merging (Combining)

2Reliability

If separate sealing materials are used for the drain pan, then sealing capability is provided, but labor and maintenance requirements increase

Engineering Contradiction:
Improvesealing capabilityVSAvoidinstallation and maintenance time
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The sealing capability is merged into the primary floor structure through the integrated composite floor assembly. The drain pan recess is formed as part of the primary floor, eliminating the need for separate sealing materials and reducing installation and maintenance time.

Inventive Principle:
Principle #5Merging (Combining)

3Productivity

If additional drainage components are installed, then liquid removal efficiency is improved, but design complexity increases

Engineering Contradiction:
Improveliquid removal efficiencyVSAvoidfloor assembly complexity
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The drainage functionality is merged into the primary floor structure through the integrated composite floor assembly. The drain pan recess is formed during primary floor construction, achieving efficient liquid removal without increasing design complexity.

Inventive Principle:
Principle #5Merging (Combining)

4Temperature

If separate drain pan insulation is installed, then thermal insulation capability is provided, but material usage and greenhouse gas emissions increase

Engineering Contradiction:
Improvethermal insulation capabilityVSAvoidinsulation material usage
Core Design Contradiction:
TemperatureVSLoss of substance

Solution Approach 1:

The thermal insulation capability is merged into the primary floor structure through the integrated composite floor assembly. The drain pan recess is formed as part of the primary floor, eliminating the need for separate insulation materials and reducing greenhouse gas emissions.

Inventive Principle:
Principle #5Merging (Combining)

Data Source

PatentUS20240174271A1Composite Railcar Floor Assembly
Publication Date: 2024.05.30 TRINITY NORTH AMERICAN FREIGHT CAR INC
  • US20240174271A1 patent drawing
  • US20240174271A1 patent drawing
  • US20240174271A1 patent drawing

AI summary

A railcar comprises a composite floor assembly. The composite floor assembly comprises a plurality of channels disposed on top of an underframe and longitudinally extending along a length of the composite floor assembly. Each of the plurality of channels forms a recessed portion to allow the flow of liquid. The composite floor assembly further comprises an integral drain pan integrated into the composite floor assembly such that the integral drain pan forms a recessed portion along the longitudinal end of the composite floor assembly. The integral drain pan is configured to accumulate the liquid flown from the plurality of channels.