Concentric Railway Loop Track for High Throughput

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current railway track designs for unit and intermodal trains are inefficient in accommodating multiple trains, leading to increased infrastructure costs, limited throughput, and operational delays due to the need for extensive trackage and precise scheduling, especially in locations with limited real estate and high volumes of cargo handling.

Innovation Solution

The implementation of a high-throughput loop track design featuring concentric staging tracks and an interior balloon loop allows multiple trains to enter and exit without path conflicts, enabling independent train operations and reducing the need for extensive trackage, with trains able to turn within the interior space without locomotive repositioning, and providing access to interior spaces without grade-separated crossings.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If a conventional single loop track design is used, then the facility can accommodate one unit train without blocking the main line, but the facility cannot efficiently accommodate multiple unit trains simultaneously, requiring increased trackage and additional investment

Engineering Contradiction:
Improvetrain throughput capacityVSAvoidtrackage infrastructure
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The facility is segmented into multiple functional zones: an outer loop track for train circulation, an inner balloon loop for loading/unloading operations, and multiple staging tracks. This segmentation allows different train operations to occur simultaneously in different zones, increasing throughput without proportionally increasing total trackage length

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The inner balloon loop track is nested within the outer loop track, creating a concentric configuration. This nested design allows the facility to handle multiple trains simultaneously - one train can circulate on the outer loop while another performs loading/unloading on the inner balloon loop, effectively doubling capacity without requiring a complete second loop

Inventive Principle:
Principle #7Nested doll (Nesting)

2Productivity

If the loop track is expanded to accommodate multiple trains, then multiple trains can be handled, but the facility footprint increases and real estate costs increase

Engineering Contradiction:
Improvenumber of trains accommodatedVSAvoidfacility footprint
Core Design Contradiction:
ProductivityVSArea of stationary object

Solution Approach 1:

The design transitions from a single-planar loop to a multi-layered concentric configuration. By utilizing the radial dimension (creating inner and outer loops), the facility accommodates multiple trains within a compact circular footprint, effectively increasing capacity without proportionally increasing the overall land area required

Inventive Principle:
Principle #17Another dimension (Dimensionality change)

3Ease of operation

If a conventional loop track design is used, then trains can circulate and be loaded/unloaded, but trains must block the throat area to enter and exit the loop, potentially conflicting with main line traffic

Engineering Contradiction:
Improvetrain circulationVSAvoidmain line traffic flow
Core Design Contradiction:
Ease of operationVSReliability

Solution Approach 1:

The loading and unloading operations are extracted from the main loop circulation path and placed on a separate inner balloon loop. This allows trains to enter and exit the outer loop through the throat area without blocking main line traffic, while simultaneously performing loading/unloading on the inner loop, separating circulation functions from cargo handling functions

Inventive Principle:
Principle #2Taking out (Extraction)

4Productivity

If multiple staging tracks are added to handle multiple trains, then throughput increases, but infrastructure investment and maintenance costs increase

Engineering Contradiction:
Improvesimultaneous train handling capacityVSAvoidinfrastructure investment
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The outer loop track serves multiple functions: it acts as a circulation path for trains entering and exiting the facility, provides staging capacity for multiple trains simultaneously, and allows trains to wait without blocking the throat area. This multi-functionality increases throughput capacity without requiring separate dedicated tracks for each function, reducing overall infrastructure investment

Inventive Principle:
Principle #6Universality (Multi-functionality)

Data Source

PatentUS11027752B2Railway facility with high throughput loop track
Publication Date: 2021.06.08 HDR INC
  • US11027752B2 patent drawing
  • US11027752B2 patent drawing
  • US11027752B2 patent drawing

AI summary

A railway facility with high throughput loop track includes a series of adjacent parallel staging tracks connected to a main line to receive and depart trains, arranged in a path so that trains transverse around the railway facility. A balloon loop track, which includes a loading or unloading facility, is connected to the staging tracks loops and reverses the direction of the train so that upon completion of loading or unloading a train can depart or be re-staged without requiring repositioning or turning of locomotives. Staging tracks are included for staging both arriving and departing trains. In alternative embodiments transload tracks and at-grade access roads allow storage and retrieval of cargo to interior space within the staging tracks, and an escape track allows expedited exit of trains from the balloon loop track.