Project Support System for Consensus-Building Task Scheduling

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current project management tools lack the capability to effectively manage schedules for consensus-building tasks, including background work, which are essential for the smooth execution of projects, as they do not provide adequate support for informal face-to-face conversations and optimal conversation formats.

Innovation Solution

A project support system and method that includes a model case generation unit, a project generation unit, and a display unit to create and manage consensus-building plans, specifically incorporating optimal conversation formats for background work, ensuring timely and effective execution of consensus-building tasks.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Adaptability or versatility

If current project management tools are used, then general operation planning and performance tracking are supported, but schedule management for consensus-building tasks including background work is not supported

Engineering Contradiction:
Improvecapability to manage consensus-building tasksVSAvoidschedule management effectiveness
Core Design Contradiction:
Adaptability or versatilityVSReliability

Solution Approach 1:

The patent segments project tasks into two distinct categories: general operations and consensus-building tasks. By creating separate management mechanisms for each type, the system can apply specialized scheduling and tracking methods to consensus-building activities while maintaining overall project coordination. This segmentation allows the system to address the specific needs of background work without compromising general project management capabilities.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The patent introduces a consensus-building task management module as an intermediary component between the project manager and the execution team. This module serves as a mediator that translates general project requirements into specific consensus-building schedules, tracks progress, and provides feedback. The intermediary handles the complexity of managing informal conversations and background work, shielding the overall project management system from these complexities while ensuring reliable schedule management.

Inventive Principle:
Principle #24Intermediary (Mediator)

2Productivity

If informal face-to-face conversations are used for background work, then consensus-building effectiveness is improved, but scheduling and tracking become difficult

Engineering Contradiction:
Improveconsensus-building effectivenessVSAvoidscheduling system complexity
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The patent creates a virtual representation or copy of the informal conversation process within the management system. Instead of trying to manage the actual physical conversations directly, the system maintains a digital model that captures the essence, schedule, and outcomes of these informal interactions. This copying approach allows informal conversations to proceed naturally while their management aspects are handled systematically through the digital representation.

Inventive Principle:
Principle #26Copying

Solution Approach 2:

The patent transforms the management of informal conversations by changing key parameters from qualitative to quantitative measures. It introduces specific parameters such as scheduled time, responsible party, expected outcomes, and actual completion status for background work. By defining these measurable parameters, the system can track and manage informal conversations using standard project management techniques without losing their informal nature.

Inventive Principle:
Principle #35Parameter changes

3Reliability

If comprehensive tracking of consensus-building tasks is implemented, then project execution smoothness is improved, but system complexity increases

Engineering Contradiction:
Improveproject execution smoothnessVSAvoidmanagement system complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The patent designs the consensus-building task management module to perform multiple functions within a single integrated system. The module can create schedules, track progress, generate reports, and provide alerts all through one interface. By consolidating these functions rather than creating separate systems for each task, the patent reduces overall system complexity while maintaining comprehensive tracking capabilities that ensure smooth project execution.

Inventive Principle:
Principle #6Universality (Multi-functionality)

Data Source

PatentUS10860960B2Project support system and method
Publication Date: 2020.12.08 HITACHI LTD
  • US10860960B2 patent drawing
  • US10860960B2 patent drawing
  • US10860960B2 patent drawing

AI summary

A project support system supports the smooth operation of a project. For each predetermined unit that a project comprises, a model case which prescribes a target for each consensus-building task, and an ideal execution time and execution method for each of the consensus-building tasks based on the performance of each consensus-building task executed in a previous project is generated. A consensus building plan which prescribes, for each of the predetermined units, a target, an execution time and an execution method for each of the consensus-building tasks which are to be executed in a current project based on information of the current project and the corresponding model case is generated.