Problem

Existing systems for tracking project data during construction projects face challenges in precision and accuracy due to issues with recording and standardization of project completion data, making it difficult to track labor efficiency and estimate labor costs effectively.

Innovation Solution

A data visualization system that transforms construction drawings and visually tracks data throughout a project lifecycle by standardizing completion data recording across task zones, using JSON packages to render shapes and update project completion visualizations based on work completed, and uploading data to a storage database via an API.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Measurement precision

If construction drawings are transformed and completion data is standardized across task zones, then measurement precision of project completion tracking is improved, but device complexity increases due to JSON packages, APIs, and database integration

Engineering Contradiction:
Improveproject completion tracking precisionVSAvoidsystem complexity
Core Design Contradiction:
Measurement precisionVSDevice complexity

Solution Approach 1:

The construction drawing is segmented into multiple task zones (shapes) with unique identifiers, allowing completion data to be tracked independently for each zone. This segmentation enables precise measurement of completion status for specific areas while maintaining standardized data collection across the entire project through consistent JSON formatting and API interfaces.

Inventive Principle:
Principle #1Segmentation

2Productivity

If real-time visual tracking of project completion data is implemented, then productivity is improved through better labor efficiency monitoring, but loss of time increases due to data processing and visualization updates

Engineering Contradiction:
Improvelabor efficiency monitoringVSAvoiddata processing time
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

Task zones are pre-defined with unique identifiers and associated metadata (labor codes, materials, costs) before construction begins. This preliminary setup allows completion data to be directly mapped to predefined zones during construction, eliminating the need for real-time data structuring and reducing processing time while enabling immediate visual feedback through the visualization system.

Inventive Principle:
Principle #10Preliminary action

3Ease of operation

If construction drawings are transformed into visual formats with overlaid shapes, then ease of operation is improved for mobile device viewing, but loss of information increases due to potential data compression or simplification

Engineering Contradiction:
Improvemobile device viewing convenienceVSAvoiddrawing data integrity
Core Design Contradiction:
Ease of operationVSLoss of information

Solution Approach 1:

The system creates a digital copy of the construction drawing and overlays transparent shapes with unique identifiers on specific task zones. This copying approach preserves the original drawing information while adding functional layers for data tracking. The overlaid shapes contain reference identifiers that link back to comprehensive data stored in the database, ensuring no information is lost despite the visual simplification needed for mobile device display.

Inventive Principle:
Principle #26Copying

Data Source

PatentUS11836419B1Systems and processes for transformation of construction drawings and visual tracking of data
Publication Date: 2023.12.05 ESTIMATING EDGE LLC
  • US11836419B1 patent drawing
  • US11836419B1 patent drawing
  • US11836419B1 patent drawing

AI summary

In various embodiments, the data visualization system imports and displays, on an electronic device (e.g., a tablet, desktop computing device, etc.), a representation of a construction drawing of a project and corresponding one or more shapes. In one or more embodiments, the one or more shapes may represent an area of the construction drawing. In one or more embodiments, the data visualization system may track project completion and assign colors to the one or more shapes indicating work completion for those shapes.