Problem

Current systems for construction material quantity certification are inefficient and error-prone due to incompatible databases among contractors, suppliers, and project owners, leading to manual intervention and complications in verifying delivery quantities and quality, especially in federally funded projects where stringent source documentation is required.

Innovation Solution

A construction material quantity certification system that includes electronic databases and a server to automatically store and verify data on construction material deliveries, associating each delivery with a contractor and project, and updating chain of custody information, enabling the generation of traceable quantity certifications and compliance with material specifications.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of operation

If manual sorting and handling of haul tickets is used, then data can be properly handled and organized, but labor intensity and time consumption increase significantly

Engineering Contradiction:
Improvedata handling capabilityVSAvoidtime consumption
Core Design Contradiction:
Ease of operationVSLoss of time

Solution Approach 1:

The patent replaces manual mechanical sorting and handling of paper haul tickets with an automated electronic system. The server automatically receives, stores, and processes electronic haul tickets from multiple suppliers, eliminating the need for manual paper sorting while maintaining data organization capabilities. This substitution of mechanical manual operations with automated electronic processing resolves the contradiction between ease of operation and time consumption.

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

2Speed

If electronic databases are used by multiple parties, then information exchange speed improves, but data incompatibility and verification complexity increase

Engineering Contradiction:
Improveinformation exchange speedVSAvoiddata incompatibility
Core Design Contradiction:
SpeedVSDevice complexity

Solution Approach 1:

The patent introduces a central server as an intermediary that receives, standardizes, and stores data from multiple suppliers' databases. This intermediary server acts as a mediator that handles data incompatibility issues by providing a common platform for data exchange, allowing multiple parties to maintain their own databases while ensuring compatibility through the central server's standardized data structure and verification processes.

Inventive Principle:
Principle #24Intermediary (Mediator)

3Reliability

If multiple independent databases are maintained by contractors and suppliers, then data security and autonomy are preserved, but traceability and certification accuracy decrease

Engineering Contradiction:
Improvedata autonomyVSAvoidtraceability accuracy
Core Design Contradiction:
ReliabilityVSMeasurement precision

Solution Approach 1:

The patent merges multiple independent databases into a unified electronic database system while preserving the autonomy of individual contributors. The server consolidates data from suppliers, contractors, and other parties into a single traceable record that maintains the integrity of source data while enabling comprehensive traceability. This merging allows the system to achieve both data autonomy (through maintained source records) and traceability accuracy (through unified certification records).

Inventive Principle:
Principle #5Merging (Combining)

Data Source

PatentUS20230334391A1Construction Material Quantity Certification System with Life Cycle Chain of Custody Capability
Publication Date: 2023.10.19 HAUL HUB INC
  • US20230334391A1 patent drawing
  • US20230334391A1 patent drawing
  • US20230334391A1 patent drawing

AI summary

A construction material quantity certification system includes first and second electronic databases that store construction project data and contractor data, as well as data about a plurality of deliveries of construction materials, including source records that identify sources of the delivered construction materials and chain of custody data. A server is coupled to plurality of devices, such as vehicle weight scales, configured to provide data about respective quantities of construction materials loaded onto respective vehicles. The server automatically obtains data about the respective quantities of construction materials from the plurality of devices, stores the data in the second database, associates each delivery to an associated contractor and to an associated project, updates the chain of custody data and, in response to receipt of a user input, uses data in the databases to automatically store a construction material quantity certification traceable to the source records of construction materials.