Building Construction Module Notches for Forklift Handling and Pipe Passage
Find Innovative SolutionsGenerate Solutions
Solution Overview
Problem
Modular construction faces challenges in handling and assembly of building modules, including risk of damage during transport, labor-intensive assembly, and damage to insulation and vapor barriers during pipe installation.
Innovation Solution
The construction module features notches in side uprights for forklift handling, allowing even weight distribution and safe transport, and facilitates easy passage of pipes and conduits, with crosspieces positioned at central notches to support forklifts and intermediate uprights for stable assembly, and a hooking system for secure module connection.
Engineering Contradictions & Design Principles
Engineering Contradiction Analysis
1Productivity
If modules are stacked on pallets for transport, then transport efficiency is improved, but modules risk falling and being damaged
Solution Approach 1:
The side uprights are segmented with notches that allow forklift forks to insert and provide support at multiple points along the module stack, preventing modules from falling while maintaining transport efficiency
Solution Approach 2:
Forklift forks act as an intermediary element between the pallet and the modules, inserting into notches to provide stable support and eliminate the risk of modules falling during transport
2Strength
If modules are assembled by screwing and gluing, then structural strength is improved, but assembly time and labor requirements increase
Solution Approach 1:
Notches are pre-formed in the side uprights during manufacturing, allowing forklift forks to be inserted immediately upon arrival at the construction site, enabling rapid positioning and assembly without time-consuming drilling or reservation work
Solution Approach 2:
The notches are self-positioning features that guide the forklift forks into the correct location, eliminating the need for precise manual alignment and reducing assembly time while maintaining structural integrity
3Adaptability or versatility
If pipes are installed through drillings in modules, then utility passage is achieved, but insulation and vapor barrier are damaged
Solution Approach 1:
Notches are pre-formed in the side uprights during manufacturing, allowing pipes to be inserted through these pre-prepared openings without the need for on-site drilling that would damage insulation and vapor barriers
Solution Approach 2:
The notches serve as an intermediary structure that provides a dedicated pathway for pipes, separating the utility installation function from the insulation and vapor barrier functions
Data Source
Figure 1
Figure 2
Figure 3A~3B
AI summary
The module (10) has notches (11, 21, 31, 41) placed in lateral uprights (13, 23, 33, 43) to allow passage of pipes and distributed on the uprights on both sides of a horizontal symmetry axis (S). Two central notches, surrounding the axis of symmetry, are practiced, so that spacing (E) of the central notches corresponds to a standard spacing of forks of a fork lift truck. Intermediate uprights include notches aligned with the notches of the side uprights. The notches are partially closed again after the passage of the pipes.