Construction Site Person Tracking via Image and Terrain Data Fusion

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

In construction sites, it is challenging to efficiently monitor the position of individuals to maintain construction efficiency.

Innovation Solution

A construction management system that includes an image data acquisition unit, terrain data storage, a person specifying unit, a two-dimensional position specifying unit, and a three-dimensional position specifying unit, which together enable the accurate tracking of a person's position within the construction site by combining image data and terrain data.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Measurement precision

If image data and terrain data are combined to specify three-dimensional position, then measurement precision is improved, but device complexity increases

Engineering Contradiction:
Improveposition specification precisionVSAvoidsystem complexity
Core Design Contradiction:
Measurement precisionVSDevice complexity

Solution Approach 1:

The system divides the position specification task into multiple independent modules: image data acquisition unit, terrain data storage unit, person specifying unit, two-dimensional position specifying unit, and three-dimensional position specifying unit. Each module handles a specific aspect of the problem, making the complex system manageable and maintainable while achieving high precision through their coordinated operation.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The system transitions from two-dimensional image coordinates to three-dimensional real-world positions by integrating terrain elevation data. The three-dimensional position specifying unit uses the two-dimensional position from the image and combines it with terrain height information to calculate the full three-dimensional coordinates, adding a vertical dimension to the position specification.

Inventive Principle:
Principle #17Another dimension (Dimensionality change)

2Productivity

If real-time monitoring is implemented, then productivity is improved, but use of energy increases

Engineering Contradiction:
Improveconstruction efficiencyVSAvoidenergy consumption
Core Design Contradiction:
ProductivityVSUse of energy by moving object

Solution Approach 1:

The system implements periodic monitoring by capturing image data at regular intervals rather than continuous monitoring. The image data acquisition unit periodically acquires new images, and the processing units periodically update position specifications, providing real-time monitoring capability while allowing energy-saving intervals between measurements.

Inventive Principle:
Principle #19Periodic action

Solution Approach 2:

The system uses the existing terrain data that is already stored in the terrain data storage unit (likely from previous surveys or mapping operations) without requiring additional energy-consuming measurements. By reusing pre-acquired terrain information, the system avoids the energy cost of repeated terrain scanning while still achieving accurate three-dimensional position calculation.

Inventive Principle:
Principle #25Self-service

Data Source

PatentUS20250037217A1Construction management system and construction management method
Publication Date: 2025.01.30 KOMATSU LTD
  • US20250037217A1 patent drawing
  • US20250037217A1 patent drawing
  • US20250037217A1 patent drawing

AI summary

A construction management system includes an image data acquisition unit that acquires image data indicating an image of a construction site where a work machine operates, a terrain data storage unit that stores terrain data indicating a three-dimensional shape of a terrain shape of the construction site, a person specifying unit that specifies a person in the image, a two-dimensional position specifying unit that specifies a two-dimensional position of the person in the image, and a three-dimensional position specifying unit that specifies a three-dimensional position of the person in the construction site based on the two-dimensional position and the terrain data.