Construction Prequalification Software Tool Automation

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

The conventional subcontractor prequalification process in construction projects is cumbersome and time-consuming, relying on manual identification and evaluation of subcontractors through various communication channels, with existing software tools being rudimentary and limited in efficiency.

Innovation Solution

A software tool that facilitates the prequalification process by allowing users to create tailored forms, invite and manage subcontractor submissions, apply evaluation rules, and leverage prequalification information to automate subsequent construction project management tasks, integrating with existing construction management software suites.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Loss of information

If manual identification and evaluation of subcontractors through various communication channels is used, then comprehensive information collection is possible, but the process becomes cumbersome and time-consuming

Engineering Contradiction:
Improvecomprehensive information collectionVSAvoidprocess time
Core Design Contradiction:
Loss of informationVSLoss of time

Solution Approach 1:

The patent replaces manual mechanical processes (telephone, postal mail, email communication) with an automated electronic system that collects, stores, and evaluates subcontractor information centrally, eliminating the time-consuming manual information gathering while maintaining comprehensive data collection

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

Solution Approach 2:

The patent creates a universal prequalification system that handles multiple communication channels and evaluation criteria through a single integrated platform, allowing simultaneous information collection from multiple sources and automated evaluation across various parameters without increasing process time

Inventive Principle:
Principle #6Universality (Multi-functionality)

2Loss of information

If multiple communication channels are used for subcontractor evaluation, then information completeness is improved, but system complexity increases

Engineering Contradiction:
Improveinformation completenessVSAvoidsystem complexity
Core Design Contradiction:
Loss of informationVSDevice complexity

Solution Approach 1:

The patent merges multiple communication channels (telephone, postal mail, email, electronic systems) into a single centralized database and evaluation platform, maintaining the ability to collect information from diverse sources while simplifying the overall system through unified storage and processing

Inventive Principle:
Principle #5Merging (Combining)

3Adaptability or versatility

If manual evaluation and communication of results is performed, then flexibility in assessment is maintained, but productivity decreases

Engineering Contradiction:
Improveassessment flexibilityVSAvoidevaluation efficiency
Core Design Contradiction:
Adaptability or versatilityVSProductivity

Solution Approach 1:

The patent implements automated self-service evaluation where the system automatically collects information from multiple channels, evaluates subcontractors against predetermined criteria, and communicates results without requiring manual intervention for each step, thereby maintaining assessment flexibility through configurable parameters while dramatically improving productivity

Inventive Principle:
Principle #25Self-service

Solution Approach 2:

The patent establishes automated feedback loops where evaluation results are automatically communicated to subcontractors and stakeholders, allowing for rapid iterative assessment and decision-making while maintaining the flexibility to adjust evaluation criteria based on project requirements

Inventive Principle:
Principle #23Feedback

4Extent of automation

If existing rudimentary software tools are used for prequalification, then some automation is achieved, but efficiency and functionality remain limited

Engineering Contradiction:
Improveautomation levelVSAvoidoverall efficiency
Core Design Contradiction:
Extent of automationVSProductivity

Solution Approach 1:

The patent performs preliminary actions by pre-configuring evaluation criteria, thresholds, and communication protocols before the prequalification process begins, allowing the system to automatically evaluate subcontractors against predetermined standards and significantly improving processing efficiency compared to existing tools that require manual configuration for each evaluation

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS20230245066A1Computer System and Method for Construction Project Prequalification and Management
Publication Date: 2023.08.03 PROCORE TECHNOLOGIES INC
  • US20230245066A1 patent drawing
  • US20230245066A1 patent drawing
  • US20230245066A1 patent drawing

AI summary

An example software technology may function to both facilitate a prequalification process for construction projects and also leverage the information obtained during the prequalification process to facilitate subsequent management of a construction project. In one aspect, an example prequalification software tool may provide an interface through which a user associated with the GC can create prequalification forms for obtaining prequalification information from subcontractors, where each prequalification form can be tailored for a particular type of construction project, a particular aspect of a construction project being put out to bid or the like. In a further aspect, after a subcontractor has submitted its prequalification submission to the GC, the example prequalification software tool may provide an interface through which a user associated with the GC may review the subcontractor's prequalification submission and then, if desired, either approve or reject the subcontractor's prequalification submission (or perhaps flag it for follow up).