Problem
The existing digital key authorization systems face resource and time-intensive registration processes at Key Tracking Servers, necessitating improved key tracking data collection, especially in offline scenarios.
Innovation Solution
Storing key usage data in a secured storage device of user equipment (UE) allows for offline digital key generation and simplified data collection by eliminating the need for real-time communication links with backend systems.
Engineering Contradictions & Design Principles
Engineering Contradiction Analysis
1Reliability
If real-time communication link with backend is required for digital key registration and tracking, then key tracking data collection can be performed continuously, but resource and time intensive registration processes occur and network dependency increases
Solution Approach 1:
The patent applies preliminary action by pre-storing digital key data and usage information locally in the secured storage device of user equipment before any tracking is needed. This allows the system to perform key tracking data collection without requiring real-time communication with backend systems, eliminating the time-consuming registration processes while maintaining reliable tracking capability.
2Reliability
If real-time communication link with backend is required for digital key operations, then centralized control is maintained, but system complexity and network dependency increase
Solution Approach 1:
The patent extracts the digital key data and usage tracking functionality from the backend system and places it locally in the secured storage device of user equipment. This extraction allows digital key operations to be performed independently without requiring complex communication infrastructure, while centralized control is maintained through periodic synchronization when devices are online.
3Loss of information
If continuous network connectivity is required for digital key generation, then real-time synchronization is achieved, but offline key generation is prevented
Solution Approach 1:
The patent implements dynamics by enabling the system to adapt between online and offline modes. In offline mode, digital key generation and usage tracking occur locally using stored data. When connectivity is restored, the system dynamically synchronizes the stored usage data with the backend, ensuring information consistency while maintaining offline operational versatility.
Data Source
AI summary
An electrical assembly includes a voltage source converter including at least one energy storage device, an energy storage system electrically coupled to the voltage source converter, the energy storage system controllable to release and absorb energy, and a controller programmed to selectively trigger a control of the energy storage system to release energy or absorb energy responsive to a measurement of stored energy in the voltage source converter.