Problem

Conventional cooperage designs for barrel production are inefficient, costly, wasteful, and noisy due to poorly organized machinery and material handling systems.

Innovation Solution

A cooperage layout that positions barrel raising, windlass, and roll out stations strategically, combined with the use of a power and free conveyor to convey temporary truss hoops and bilge hoops between stations, eliminating the need for overhead conveying systems and reducing noise and space requirements.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Object-affected harmful factors

If conventional cooperage designs are used with overhead conveying systems, then material can be transported between stations, but the system becomes noisy, complex, and space-consuming

Engineering Contradiction:
Improvenoise levelsVSAvoidconveying system complexity
Core Design Contradiction:
Object-affected harmful factorsVSDevice complexity

Solution Approach 1:

The patent removes the overhead conveying system entirely from the cooperage design. Temporary hoops are handled manually or through simple track-based systems at ground level, eliminating the complex and noisy overhead conveyor infrastructure that conventional designs rely upon.

Inventive Principle:
Principle #2Taking out (Extraction)

Solution Approach 2:

The patent replaces the mechanical overhead conveying system with a simplified track-based system operating at ground level. This substitution reduces mechanical complexity and noise while maintaining the ability to transport temporary hoops between stations.

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

2Area of stationary object

If traditional material handling systems are used to transport temporary hoops, then hoops can be moved between stations, but the system requires more space and equipment

Engineering Contradiction:
Improveplant footprintVSAvoidmaterial handling equipment
Core Design Contradiction:
Area of stationary objectVSDevice complexity

Solution Approach 1:

The patent eliminates the need for extensive material handling equipment by removing temporary hoops from the conventional overhead conveying system. This extraction simplifies the overall equipment requirements and reduces the plant footprint needed for material handling infrastructure.

Inventive Principle:
Principle #2Taking out (Extraction)

Solution Approach 2:

The patent implements a system where temporary hoops are discarded after use and recovered through simple track-based return systems rather than complex material handling equipment. This approach reduces both space requirements and equipment complexity while maintaining hoop availability for continuous production.

Inventive Principle:
Principle #34Discarding and recovering

3Productivity

If barrel raising and windlass stations are positioned far apart, then each station has adequate space, but material handling becomes inefficient

Engineering Contradiction:
Improveproduction efficiencyVSAvoidmaterial handling time
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

The patent positions the barrel raising and windlass stations adjacent to each other, merging their locations to eliminate the need for complex material handling between distant stations. This spatial merging improves productivity by reducing material handling time and simplifying the overall layout.

Inventive Principle:
Principle #5Merging (Combining)

Data Source

PatentUS11084182B1Cooperage layout for barrel production process
Publication Date: 2021.08.10 BOHNERT EQUIP COMPANY
  • US11084182B1 patent drawing
  • US11084182B1 patent drawing

AI summary

A cooperage layout for a barrel production process enhances efficiency and/or reduces costs, space requirements and/or noise by positioning barrel raising, windlass, roll out, and/or bilge hoop puller stations within a cooperage and/or through the use of a power and free conveyor to convey temporary truss hoops between a truss hoop puller station and the barrel raising and windlass stations.