Critical Chain Project Management Visual Buffer

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current project management software lacks effective multi-project buffer management and task prioritization across multiple projects, leading to inefficiencies in resource allocation and delay identification in complex or multiple project environments.

Innovation Solution

A critical chain-based project management system that generates visual graphics to indicate task priorities and resource loads across multiple projects, allowing for online buffer management and throughput measurement, enabling better resource allocation and delay identification.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Adaptability or versatility

If traditional project management software is used, then basic project tracking is available, but multi-project buffer management and task prioritization across multiple projects are lacking

Engineering Contradiction:
Improvemulti-project buffer management capabilityVSAvoidsystem complexity
Core Design Contradiction:
Adaptability or versatilityVSDevice complexity

Solution Approach 1:

The project management system is designed to perform multiple functions including buffer management, task prioritization, resource allocation, and throughput measurement across multiple projects simultaneously. This universal approach allows a single system to handle diverse project management needs without requiring separate specialized tools for each function.

Inventive Principle:
Principle #6Universality (Multi-functionality)

Solution Approach 2:

The system segments project management into distinct measurable components: buffers, tasks, resources, and throughput metrics. By dividing the complex multi-project environment into these manageable segments, the system can track and optimize each element independently while maintaining overall system coherence.

Inventive Principle:
Principle #1Segmentation

2Productivity

If resources are allocated across multiple projects, then resource utilization increases, but delay identification and bottleneck detection become more difficult

Engineering Contradiction:
Improveresource utilizationVSAvoidbottleneck detection difficulty
Core Design Contradiction:
ProductivityVSDifficulty of detecting and measuring

Solution Approach 1:

The system implements continuous feedback mechanisms through throughput measurements and buffer status monitoring. Real-time data collection from multiple projects feeds into the prioritization algorithm, which automatically adjusts task priorities and resource allocation based on current system state, enabling dynamic bottleneck detection and resolution.

Inventive Principle:
Principle #23Feedback

Solution Approach 2:

The system uses visual indicators (color-coded buffers and tasks) to represent system state and priority levels. This visual feedback mechanism makes bottlenecks and delays immediately identifiable through color changes, transforming complex multi-project data into intuitive visual signals that are easy to interpret.

Inventive Principle:
Principle #32Color changes

3Reliability

If task prioritization is implemented across multiple projects, then project delivery performance improves, but the complexity of managing and tracking increases

Engineering Contradiction:
Improveon-time and within-budget project deliveryVSAvoidmanagement and tracking complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The system performs self-service through automated prioritization algorithms that continuously evaluate task importance and resource availability across all projects. The automatic recalculation of priorities based on buffer status and throughput measurements eliminates manual intervention, reducing management complexity while maintaining high reliability in project delivery.

Inventive Principle:
Principle #25Self-service

Solution Approach 2:

The system dynamically changes priority parameters based on real-time project conditions. As buffers are consumed or new information becomes available, the system automatically adjusts task priority values and resource allocation parameters, enabling adaptive management that improves delivery reliability without requiring complex manual re-planning.

Inventive Principle:
Principle #35Parameter changes

Data Source

PatentUS7921405B2Facilitation of multi-project management using throughput measurement
Publication Date: 2011.04.05 REALIZATION TECHNOLOGIES INC
  • US7921405B2 patent drawing
  • US7921405B2 patent drawing
  • US7921405B2 patent drawing

AI summary

A method on a computer for providing critical chain-based project management is disclosed. The method includes generating a list of sequential time periods for a project comprising a plurality of tasks and calculating a number of tasks for each time period. The method further includes generating a graphic that visually indicates the number of tasks for each time period and a priority of each task and providing the graphic to a user.