Problem

Conventional multi-phase switching regulators struggle to quickly respond to dramatic changes in current demands due to their reliance on large inductors, leading to voltage fluctuations and potential device failure.

Innovation Solution

A current-parking switching regulator system that includes a current source and a voltage control mechanism, where the current source is decoupled from the load and coupled to a current sink to regulate voltage levels, using a downstream controller to manage the flow of current and reduce voltage levels when necessary, allowing for faster response times without decreasing inductor size.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If a large inductor is used in a conventional multi-phase switching regulator, then voltage conversion is achieved, but the response time to current transients increases significantly

Engineering Contradiction:
Improvevoltage level stabilityVSAvoidcurrent response time
Core Design Contradiction:
ReliabilityVSSpeed

Solution Approach 1:

The patent segments the current path by introducing a bypass circuit with switching element that operates in parallel with the inductor. This allows the current to be divided between the inductor path and the bypass path, enabling fast transient response while maintaining voltage conversion capability.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The bypass circuit with switching element acts as an intermediary that mediates between the large inductor and the load. When transient current is needed, the switching element closes to provide a low-impedance path that bypasses the inductor, enabling fast response without removing the inductor.

Inventive Principle:
Principle #24Intermediary (Mediator)

2Speed

If the inductor size is decreased to improve response time, then current transient response improves, but voltage conversion capability is compromised

Engineering Contradiction:
Improvecurrent response timeVSAvoidvoltage level stability
Core Design Contradiction:
SpeedVSReliability

Solution Approach 1:

The current path is segmented into two parallel paths: one through the inductor for voltage conversion and one through the bypass circuit for fast transient response. This segmentation allows each path to be optimized for its specific function while working together to solve both problems.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The bypass circuit is dynamically controlled by the switching element that responds to transient current demands. The switching element closes when transient current is needed and opens during steady-state operation, allowing the system to adapt its configuration based on operating conditions.

Inventive Principle:
Principle #15Dynamics

3Reliability

If pulse width modulation switching synchronization is implemented, then voltage regulation is improved, but current response time increases by several microseconds

Engineering Contradiction:
Improvevoltage regulationVSAvoidcurrent response time
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The bypass circuit is pre-configured and ready to activate immediately when transient current is needed, without waiting for the PWM control cycle. This preliminary preparation allows the bypass to respond faster than the synchronized PWM switching, providing sub-microsecond transient response.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The bypass circuit allows current to rush through the low-impedance path during transients, skipping the slower inductor-based voltage conversion process. This enables the system to prioritize speed when needed while maintaining regulation through the PWM-controlled inductor path.

Inventive Principle:
Principle #21Skipping (Rushing through)

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

This solution enables faster response to current transients, reducing voltage deviations and preventing device failure by quickly adjusting current delivery to maintain stable voltage levels, even during rapid changes in current demand.

Implementation Method 1

a current source that is coupled to an electric power source and configured to generate a current and a voltage control mechanism that is coupled between the current source and the load

Methodology Applied
Scientific EffectElectrical current generation and voltage regulation:

Data Source

PatentUS9800158B2Current-parking switching regulator downstream controller
Publication Date: 2017.10.24 NVIDIA CORP
  • US9800158B2 patent drawing
  • US9800158B2 patent drawing
  • US9800158B2 patent drawing

AI summary

A system and method are provided for regulating a voltage level at a load. A current source generates a current and a voltage control mechanism provides a portion of the current to regulate the voltage level at the load. When the voltage level at the load is greater than a maximum voltage level, the current source is decoupled from the load and the current source is coupled to a current sink to reduce the voltage level at the load. An electric power conversion comprises the current source and the voltage control mechanism. A downstream controller is configured to control the voltage control mechanism to decouple the current source from the load and couple the current source to a current sink to reduce the voltage level at the load when the voltage level at the load is greater than a maximum voltage level.