Simulation Tool for Dairy Production Scheduling Optimization

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current time scheduling in dairy production plants is labor-intensive, prone to suboptimal resource utilization, and often relies on manual calculations and trial-and-error methods, failing to account for all relevant factors, leading to potential over-investment in equipment and inefficient production processes.

Innovation Solution

A computer-implemented method for simulating production scheduling in dairy plants, which involves obtaining target production data, recipes, and production unit data to generate and evaluate time schedules that optimize resource allocation, considering production capacities and constraints, thereby improving scheduling efficiency and resource utilization.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of manufacture

If manual calculations and trial-and-error methods are used for time scheduling, then the process can be performed with simple tools, but the scheduling is labor-intensive and time-consuming

Engineering Contradiction:
Improvesimplicity of scheduling methodVSAvoidtime required for scheduling
Core Design Contradiction:
Ease of manufactureVSLoss of time

Solution Approach 1:

The patent replaces manual mechanical calculations and trial-and-error methods with a computerized simulation system that automatically generates and evaluates production schedules. The simulation tool uses digital modeling to compute optimal schedules based on input parameters, eliminating the need for manual iterative adjustments and significantly reducing the time required for scheduling while maintaining simplicity through automated processes.

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

2Adaptability or versatility

If manual time scheduling is performed by process engineers, then flexibility in adjusting schedules is maintained, but the scheduling results vary depending on engineer experience and may be suboptimal

Engineering Contradiction:
Improveflexibility in schedule adjustmentVSAvoidquality and consistency of scheduling
Core Design Contradiction:
Adaptability or versatilityVSProductivity

Solution Approach 1:

The simulation tool incorporates feedback mechanisms by automatically evaluating generated schedules against multiple objectives and constraints, then iteratively refining the schedules to improve performance. The system provides feedback on schedule quality metrics and allows users to adjust parameters, with the simulation re-running to show improved results, thereby combining systematic optimization with user flexibility.

Inventive Principle:
Principle #23Feedback

Solution Approach 2:

The system allows users to modify input parameters such as production targets, constraints, and objective weights, and the simulation automatically recalculates schedules based on these parameter changes. This enables flexible adaptation to different scenarios while maintaining consistent, reproducible results based on the specified parameters rather than individual engineer experience.

Inventive Principle:
Principle #35Parameter changes

3Productivity

If thorough time scheduling is performed to account for all production factors, then resource utilization is optimized, but the scheduling process becomes excessively complex and costly

Engineering Contradiction:
Improveresource utilization efficiencyVSAvoidcomplexity of scheduling system
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The simulation tool is designed as a universal platform that handles multiple production objectives (throughput, inventory, quality, cost) and various types of constraints simultaneously through a single integrated system. Rather than requiring separate complex procedures for each objective, the tool combines them into one comprehensive simulation that optimizes all factors together, reducing overall system complexity while achieving thorough resource utilization.

Inventive Principle:
Principle #6Universality (Multi-functionality)

4Device complexity

If manual scheduling uses simplified approaches to reduce complexity, then the scheduling process is faster and easier, but resource utilization becomes suboptimal and margins are excessive

Engineering Contradiction:
Improvesimplicity of scheduling processVSAvoidresource utilization efficiency
Core Design Contradiction:
Device complexityVSProductivity

Solution Approach 1:

The simulation tool performs self-service by automatically generating optimized schedules without requiring manual simplification or approximation. The system independently evaluates multiple schedule options and selects the optimal solution based on the specified objectives and constraints, eliminating the need for users to simplify the process manually while still maintaining ease of use through automated operation.

Inventive Principle:
Principle #25Self-service

Data Source

PatentUS11631045B2Scheduling production of packaged dairy products in existing production plants by simulation
Publication Date: 2023.04.18 TETRA LAVAL HOLDINGS & FINANCE SA
  • US11631045B2 patent drawing
  • US11631045B2 patent drawing
  • US11631045B2 patent drawing

AI summary

A computer device implements a method of scheduling production of packaged dairy products in a production plant by simulation. The method obtains a production target for dairy products to be produced and packaged in the production plant, recipes for production of the packaged dairy products, where each recipe defines ingredients and recipe activities, and production unit data that specifies existing production units and available fluid paths in the production plant and associates the existing production units with unit activities and production capacities. The method further performs the simulation by generating, as a function of the recipes and the production unit data, time schedules of recipe activities performed at least partly by one or more combinations of the existing production units to achieve the production target data, and evaluating the time schedules for selection of at least one time schedule for the production plant.