Problem

Data centers face challenges in managing energy costs due to increasing power consumption and cooling demands, leading to underutilization of space and high operational expenses, with peak power demand being a significant factor in billing equations.

Innovation Solution

A power management system that monitors and assesses power consumption, implementing policies to reduce instantaneous power usage and increase the load factor by adjusting server resources and workload scheduling, thereby optimizing energy efficiency and reducing costs.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If data centers operate with higher power consumption to meet increasing computational demands, then service performance and availability are improved, but energy costs and operational expenses increase significantly

Engineering Contradiction:
Improveservice performanceVSAvoidenergy cost
Core Design Contradiction:
ProductivityVSUse of energy by moving object

Solution Approach 1:

The system dynamically adjusts power consumption levels based on real-time monitoring of service demands and workload patterns. By making power usage adaptive rather than static, the system optimizes the balance between maintaining service performance and controlling energy costs, avoiding unnecessary power consumption during low-demand periods while ensuring adequate power availability during peak service requirements

Inventive Principle:
Principle #15Dynamics

Solution Approach 2:

The system changes operational parameters such as power consumption levels, cooling requirements, and resource allocation based on assessed service needs. By adjusting these parameters dynamically rather than operating at fixed levels, the system reduces energy costs while maintaining the productivity and service performance required by business operations

Inventive Principle:
Principle #35Parameter changes

2Reliability

If data centers increase power consumption during peak periods to handle high workload demands, then service availability is maintained, but peak demand charges and billing costs increase

Engineering Contradiction:
Improveservice availabilityVSAvoidpeak power demand
Core Design Contradiction:
ReliabilityVSPower

Solution Approach 1:

The system performs preliminary assessment of power needs against billing equations and service requirements before peak periods occur. By planning and preparing power allocation in advance based on predicted workload patterns and billing structures, the system can optimize power usage to avoid excessive peak demand charges while ensuring service availability is maintained through proactive resource management

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system continuously monitors power consumption, service performance, and billing parameters, then uses this feedback to adjust power allocation decisions. This closed-loop control enables the system to learn from past peak period performance and optimize future power usage to maintain service availability while minimizing peak demand charges through data-driven decision making

Inventive Principle:
Principle #23Feedback

3Use of energy by moving object

If data centers operate with lower load factors to reduce instantaneous power consumption, then energy costs decrease, but infrastructure utilization and productivity are reduced

Engineering Contradiction:
Improvepower consumptionVSAvoidinfrastructure utilization
Core Design Contradiction:
Use of energy by moving objectVSProductivity

Solution Approach 1:

The system dynamically optimizes the load factor by adjusting it according to real-time service demands, billing conditions, and infrastructure capacity. Rather than operating at a fixed low load factor to reduce power consumption, the system adaptively modulates the load factor to maintain high infrastructure utilization during appropriate periods while managing power consumption costs through timing and pacing of workload execution

Inventive Principle:
Principle #15Dynamics

Data Source

PatentUS8001403B2Data center power management utilizing a power policy and a load factor
Publication Date: 2011.08.16 MICROSOFT TECHNOLOGY LICENSING LLC
  • US8001403B2 patent drawing
  • US8001403B2 patent drawing
  • US8001403B2 patent drawing

AI summary

An exemplary method for managing power consumption of a data center includes monitoring power consumption of a data center, assessing power consumption with respect to a billing equation for power, based on the assessment, deciding whether to implement a power policy where the power policy reduces instantaneous power consumption by the data center and increases a load factor wherein the load factor is an average power consumed by the data center divided by a peak power consumed by the data center over a period of time. Various other methods, devices, systems, etc., are also disclosed.