Database Object Delivery Infrastructure for Zero-Downtime Upgrades

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

In the context of software development, managing cross-schema dependencies in a development phase and later in a deployment phase is challenging, especially with the rapid evolution of in-memory databases that introduce new features and data formats, making it impractical to redesign Advanced Business Application Programming (ABAP) to natively support each new version.

Innovation Solution

A database object delivery infrastructure is introduced that defines a dependency model between objects managed by different infrastructures, allowing for top-level management of cross-schema dependencies through logical and physical schema names, ensuring cycle-free dependencies and enabling zero-downtime upgrades by orchestrating the deployment of database objects across multiple schemas.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Adaptability or versatility

If ABAP is updated to support new features and data formats of each new in-memory database version, then compatibility with the latest database version is improved, but the complexity and effort of maintaining ABAP increase significantly

Engineering Contradiction:
Improvecompatibility with latest database versionVSAvoidcomplexity of maintaining ABAP
Core Design Contradiction:
Adaptability or versatilityVSDevice complexity

Solution Approach 1:

The patent introduces a schema mapping layer as an intermediary between ABAP and the in-memory database. This mapping layer handles the complexity of new database features and data formats, allowing ABAP to interact with the database through a stable, version-agnostic interface. The mapping layer translates ABAP operations into database-specific operations, isolating ABAP from direct exposure to database version changes.

Inventive Principle:
Principle #24Intermediary (Mediator)

Solution Approach 2:

The system segments the database interaction layer into distinct components: the ABAP layer, the schema mapping layer, and the physical database layer. This segmentation allows each layer to evolve independently, with the schema mapping layer absorbing the impact of database version changes while preserving ABAP stability.

Inventive Principle:
Principle #1Segmentation

2Ease of operation

If cross-schema dependencies are managed without a structured infrastructure, then development flexibility is maintained, but deployment reliability and correctness deteriorate due to cyclic dependencies and incorrect deployment orders

Engineering Contradiction:
Improvedevelopment flexibilityVSAvoiddeployment correctness
Core Design Contradiction:
Ease of operationVSReliability

Solution Approach 1:

The patent performs preliminary analysis of cross-schema dependencies during the development phase, building a dependency graph that captures all relationships between database objects across schemas. This preliminary modeling enables the system to detect cyclic dependencies early and establish a valid deployment order before actual deployment occurs, preventing deployment failures.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system implements feedback mechanisms that monitor dependency relationships during development and deployment. When cyclic dependencies are detected or deployment order conflicts arise, the system provides feedback to developers to resolve the issues, ensuring deployment reliability while maintaining development flexibility.

Inventive Principle:
Principle #23Feedback

3Reliability

If database objects are deployed with downtime to ensure proper installation order and dependency resolution, then deployment reliability is improved, but service availability deteriorates during the deployment process

Engineering Contradiction:
Improvedeployment reliabilityVSAvoidservice downtime
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The patent performs preliminary dependency analysis and deployment order determination before actual deployment, creating a validated deployment plan that ensures correctness. This preliminary planning enables subsequent deployments to proceed with minimal or zero downtime, as the system can apply changes in the pre-determined safe order without requiring service interruption.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system implements dynamic deployment strategies that can adapt to different scenarios, including zero-downtime deployment modes where possible. The deployment infrastructure can dynamically adjust the deployment process based on the dependency graph, allowing continuous service operation while maintaining deployment reliability.

Inventive Principle:
Principle #15Dynamics

Data Source

PatentEP3321798B1Database object delivery infrastructure
Publication Date: 2022.09.21 SAP SE
  • EP3321798B1 patent drawingFigure 1
  • EP3321798B1 patent drawingFigure 2
  • EP3321798B1 patent drawingFigure 3

AI summary

In an example embodiment, one or more changes to one or more objects in the software object database are received from a developer. A change list is generated based on the one or more changes. An object definition is exported for every object in the change list from a first schema in the database to a second schema in the software object database. A first object in the second schema is activated by mapping a logical schema name specified in the object definition for the first object to a corresponding physical schema name and creating or altering the first object in the second schema using the physical schema name.