Problem

The challenge in drilling geological formations is to achieve a fast and safe rate of penetration while managing borehole pressure, as excessive pressure can lead to formation damage and 'blowouts, and insufficient pressure can result in inefficient drilling, making it difficult to optimize drilling time and cost effectively.

Innovation Solution

The system utilizes real-time pressure data and modeled equivalent circulating density (ECD) data through statistical analysis to determine a safe and optimal rate of penetration by calculating the standard deviation of differences between actual and modeled data, allowing for selective drilling activity compression/expansion to increase the drilling rate while maintaining safe operating conditions.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If drilling speed is increased to reduce time and cost, then productivity improves, but borehole pressure control becomes more difficult and safety risks increase

Engineering Contradiction:
Improvedrilling speedVSAvoidborehole pressure control
Core Design Contradiction:
ProductivityVSReliability

Solution Approach 1:

The system continuously monitors actual borehole pressure during drilling and compares it with modeled ECD values in real-time. This feedback loop enables dynamic adjustment of drilling parameters to maintain safe operating conditions while maximizing drilling speed. The real-time comparison allows the system to respond immediately to pressure deviations, ensuring safety constraints are met even at higher drilling rates.

Inventive Principle:
Principle #23Feedback

Solution Approach 2:

The system pre-calculates the equivalent circulating density (ECD) curve based on planned drilling parameters and formation characteristics before drilling begins. This preliminary action establishes a safe operating envelope that guides real-time drilling decisions, allowing operators to plan faster drilling rates while knowing in advance the pressure constraints that must be maintained.

Inventive Principle:
Principle #10Preliminary action

2Productivity

If real-time pressure monitoring and analysis systems are implemented to optimize drilling rate, then drilling safety and efficiency improve, but system complexity increases

Engineering Contradiction:
Improvedrilling optimizationVSAvoidpressure monitoring system
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The system integrates multiple functions into a unified platform: real-time pressure data acquisition, ECD modeling and calculation, statistical analysis (standard deviation computation), and drilling rate optimization recommendations. By combining these functions into a single multi-functional system, the patent reduces the need for separate independent systems while achieving comprehensive drilling optimization.

Inventive Principle:
Principle #6Universality (Multi-functionality)

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

This approach enables increased productivity by allowing a safe increase in drilling rate, reducing non-productive time and costs associated with drilling operations, while ensuring that the drilling process remains within safe pressure limits, thereby optimizing time and monetary savings.

Implementation Method 1

Equivalent circulating density may be calculated from an annulus pressure (pressure of the circulating mud) measurement take at a selected position in the annulus based on the familiar expression for hydrostatic pressure of a column of fluid: p represents the pressure, ρ represents the fluid density, g represents gravity, and h represents the vertical depth of the position at which the pressure is measured.

Methodology Applied
Scientific EffectHydrostatic pressure: Pascal's Law

Data Source

PatentEP2539540B1System and method for optimizing drilling speed
Publication Date: 2015.01.21 HALLIBURTON ENERGY SERVICES INC
  • EP2539540B1 patent drawingFigure 1
  • EP2539540B1 patent drawingFigure 2
  • EP2539540B1 patent drawingFigure 3

AI summary

The present invention provides a method for optimizing rate of penetration when drilling into a geological formation comprising the steps of: gathering real-time PWD (pressure while drilling) data; acquiring modeled ECD (equivalent circulating density) data; calculating the standard deviation of the differences of said real-time PWD and said modeled ECD data; calculating a predicted maximun tolerable ECD based on the calculated deviation; and determining the rate of penetration of a drill string based on the maximum tolerable ECD of a drilling process. In another aspect the present invention provides a system for optimizing rate of penetration, which system can be used to control the rate of penetration of a drill string based on the maximum tolerable ECD of a drilling process.