Liquid-Column Resonant Droplet Projector Blockage Prevention
Find Innovative SolutionsGenerate Solutions
Solution Overview
Problem
The productivity of particulate production is hindered by issues such as increased viscosity and solidification of toner component liquids in projection holes, leading to blockages and unstable droplet projection, which decreases the efficiency of droplet discharge and overall toner production in spray granulation methods.
Innovation Solution
Introducing an initial liquid with a lower concentration of particulate components into the projection hole at the start of discharging, followed by discharging and solidifying the droplet to form a particulate, using a liquid-column resonant droplet projector to maintain stable projection and productivity.
Engineering Contradictions & Design Principles
Engineering Contradiction Analysis
1Productivity
If spray granulation method is used to produce particulate, then productivity is improved compared to conventional methods, but projection hole blockages occur due to liquid drying and solidification
Solution Approach 1:
The patent applies preliminary action by introducing a solvent liquid into the projection hole before the toner component liquid. This preliminary introduction of solvent prevents the toner component liquid from drying and solidifying in the projection hole, thereby preventing blockages and ensuring continuous stable discharge during particulate production.
2Productivity
If toner component liquid is discharged continuously, then productivity is maintained, but viscosity increases and projection hole becomes blocked
Solution Approach 1:
The patent uses solvent liquid as an intermediary substance that is introduced into the projection hole before the toner component liquid. This intermediary solvent prevents direct contact and drying of the toner component liquid in the projection hole, allowing continuous discharge without time loss for washing or maintenance.
3Reliability
If projection hole is washed to restore projectability, then discharge stability is improved, but productivity decreases due to production halt
Solution Approach 1:
The patent applies preliminary action by pre-introducing solvent liquid into the projection hole before discharge begins. This preventive measure eliminates the need for subsequent washing operations to restore projectability, allowing continuous production without interruptions and maintaining high productivity.
Applied Scientific Principles
This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.
Function Achieved in This Case
This method enhances the productivity of particulate production by maintaining stable droplet projection and reducing the likelihood of projection hole blockages, thereby improving the efficiency of toner production and maintaining consistent particle diameter distribution.
Implementation Method 1
using a liquid-column resonant droplet projector to maintain stable projection
Implementation Method 2
solidifying the droplet to form a particulate
Data Source
AI summary
A method of producing particulate, including introducing an initial liquid including a particulate component in a lower concentration than that of a liquid including a particulate component or no concentration to a projection hole of a droplet projector so as to be projected at the start of the discharging; discharging a droplet of the liquid comprising a particulate component from the projection hole; and solidifying the droplet to form a particulate.


