Problem

Conventional wall installation methods, such as drywall installation, are time-consuming and require shutting down commercial locations due to regulatory compliance, involve on-site painting and sealing, and can compromise fire safety, necessitating costly treatments for alternative materials.

Innovation Solution

The improved wall installation method involves reverse installation of drywall panels with fire tape on the back, secured without penetrating holes, and pre-applied protective coatings and paint, using 'J' rail connections and attachment clamps to maintain fire compliance and keep commercial locations open during installation.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If traditional dry wall installation methods are used, then the wall can be installed and fire code requirements can be met, but the installation process is lengthy and requires shutting down commercial locations

Engineering Contradiction:
Improvefire code complianceVSAvoidinstallation speed
Core Design Contradiction:
ReliabilityVSProductivity

Solution Approach 1:

The fire tape is pre-applied to the back side of the drywall panels during manufacturing, and the panels are pre-painted before installation. This preliminary preparation eliminates the need for time-consuming on-site mudding, taping, and painting operations, allowing commercial locations to remain open during installation while maintaining fire code compliance.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The patent inverts the traditional installation approach by applying fire tape to the back side of the drywall panels rather than the front. This reverse application allows the tape to be concealed between panels and structural elements, eliminating the need for visible repair work and on-site finishing operations.

Inventive Principle:
Principle #13The other way round (Inversion)

2Ease of manufacture

If traditional dry wall installation methods are used, then the wall can be assembled, but on-site painting and sealing are required which cause odors and undesirable effects

Engineering Contradiction:
Improvewall assemblyVSAvoidodors from paints and solvents
Core Design Contradiction:
Ease of manufactureVSObject-generated harmful factors

Solution Approach 1:

The drywall panels are pre-painted and sealed at the manufacturing facility before delivery to the installation site. This preliminary action transfers the painting operation from the occupied commercial space to the manufacturing environment, eliminating odors and harmful volatile organic compounds from the installation location while maintaining the ease of wall assembly.

Inventive Principle:
Principle #10Preliminary action

3Strength

If screws are used to secure dry wall panels, then the panels can be attached to studs, but holes are created that compromise fire wall integrity and require on-site mudding

Engineering Contradiction:
Improvepanel attachmentVSAvoidfire wall integrity
Core Design Contradiction:
StrengthVSReliability

Solution Approach 1:

The patent extracts the fastening operation from the front side of the drywall panels, eliminating the need to drive screws through the fire-rated surface. By securing panels from the back side or using alternative attachment methods, the integrity of the fire wall is preserved without requiring subsequent repair operations.

Inventive Principle:
Principle #2Taking out (Extraction)

4Ease of manufacture

If dry wall is used for wall installation, then cost-effective material is selected, but the installation process is time-consuming compared to alternative materials

Engineering Contradiction:
Improvematerial costVSAvoidinstallation time
Core Design Contradiction:
Ease of manufactureVSLoss of time

Solution Approach 1:

The drywall panels are delivered to the site with all fire safety features (back-side tape application) and aesthetic finishes (painting) pre-applied during manufacturing. This preliminary preparation maintains the cost-effectiveness of drywall while eliminating the time-consuming on-site finishing operations that traditionally made drywall installation slower than alternative materials.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS9290931B2Wall installation systems and methods
Publication Date: 2016.03.22 EMEH INC
  • US9290931B2 patent drawing
  • US9290931B2 patent drawing
  • US9290931B2 patent drawing

AI summary

A wall installation system and method include providing a first wall panel with tape extending vertically from top to bottom on one side of the first wall panel and on a back of the first wall panel; securing the first wall panel at a site; placing a second wall panel adjacent to the first wall panel; and connecting the tape to the second wall panel to form a fire barrier seal between the first wall panel and the second wall panel.