Dual Grid Access Points for Data Center Power Redundancy

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Data centers face frequent downtime due to power unavailability, which is often addressed by expensive and carbon-emitting backup generators, necessitating a cost-effective and environmentally friendly solution for reliable power access.

Innovation Solution

Connecting data centers to a power grid at two separate access points with at least one power generation system between them, ensuring redundancy and eliminating the need for on-site generators by leveraging the power grid's redundancy.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If backup generators are coupled to the data center, then power availability is improved, but cost and carbon emissions worsen

Engineering Contradiction:
Improvepower availabilityVSAvoidcarbon emissions
Core Design Contradiction:
ReliabilityVSObject-generated harmful factors

Solution Approach 1:

The patent extracts the backup power function from the data center site by utilizing the existing power grid infrastructure instead of installing local generators. The redundant power connection is obtained by connecting to a second access point on the power grid, which provides backup power capability without requiring on-site generator equipment, thereby eliminating carbon emissions while maintaining power availability.

Inventive Principle:
Principle #2Taking out (Extraction)

2Reliability

If backup generators are coupled to the data center, then power availability is improved, but implementation cost worsens

Engineering Contradiction:
Improvepower availabilityVSAvoidimplementation cost
Core Design Contradiction:
ReliabilityVSEase of manufacture

Solution Approach 1:

The patent removes the need for expensive backup generator equipment by extracting the backup power capability from the data center premises and obtaining it through the power grid's existing infrastructure. This approach eliminates capital expenditure on generators, fuel storage facilities, and maintenance contracts while achieving the same reliability objective through grid redundancy.

Inventive Principle:
Principle #2Taking out (Extraction)

Solution Approach 2:

The patent utilizes the power grid's existing infrastructure for multiple purposes: the grid serves both as the primary power source and as the backup power source through a second access point. This multi-functionality eliminates the need for dedicated backup generation equipment, reducing implementation costs while maintaining power availability.

Inventive Principle:
Principle #6Universality (Multi-functionality)

3Reliability

If multiple power grid access points are connected, then power availability is improved, but system complexity worsens

Engineering Contradiction:
Improvepower availabilityVSAvoidsystem complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The patent introduces the power grid as an intermediary system that manages the complexity of providing redundant power. Instead of the data center directly managing backup generators and switching logic, the power grid infrastructure with its multiple access points and control systems handles the redundancy management, simplifying the data center's power system while improving reliability.

Inventive Principle:
Principle #24Intermediary (Mediator)

Data Source

PatentUS8736109B2Powering a data center using multiple connections from a utility grid
Publication Date: 2014.05.27 META PLATFORMS INC
  • US8736109B2 patent drawing
  • US8736109B2 patent drawing
  • US8736109B2 patent drawing

AI summary

A data center is electrically coupled to a power grid at two separate access points, which may be located within geographic proximity to each other. Each access point is located between two power generation systems. The access points have one or more power generation systems located between them, allowing the data center to be coupled to three or more power generation systems simultaneously and have access to power in the event of multiple power generation system failure. The data center may comprise two separate data center power inputs, which may each be connected to a separate power grid access point. The power grid may provide a high voltage level to the data center, and the data center may comprise transformers which step the voltage down to a lower voltage level. The data center may comprise one such transformer coupled to each of the two data center power inputs. The outputs of such transformers may be coupled together.