Dual-Operator Cabin Work Machine for Narrow Space Maneuvering

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current work machines, such as mobile cranes, face challenges in maneuvering in narrow spaces due to limited operator visibility and the need to change positions during rear movement, and they often require additional chassis support, which increases weight and restricts cargo capacity and lifting capabilities.

Innovation Solution

A work machine with dual operator cabins on both sides, allowing operators to drive without changing positions, combined with a high-capacity crane system featuring shortened boom arms for close-range cargo handling and a monobloc chassis for single-chassis cargo support, enabling efficient cargo transport in restricted areas without the need for additional support feet or elevated boom operations.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of operation

If mobile crane is used for carrying goods, then easy transport and practical use are improved, but operator visibility is limited and rear manoeuvre becomes dangerous

Engineering Contradiction:
Improveease of transportVSAvoidoperator visibility
Core Design Contradiction:
Ease of operationVSReliability

Solution Approach 1:

The vehicle is divided into two separate operator cabins positioned at the front and rear of the chassis. This segmentation allows each operator to independently control the vehicle from their respective positions, eliminating the visibility limitations of a single-cab design while maintaining the practical ease of transport.

Inventive Principle:
Principle #1Segmentation

2Power

If additional chassis is used to carry crane system, then crane capacity is improved, but vehicle weight increases

Engineering Contradiction:
Improvecrane capacityVSAvoidvehicle weight
Core Design Contradiction:
PowerVSWeight of moving object

Solution Approach 1:

The crane system is merged with the vehicle chassis, forming an integrated structure where the crane boom and lifting mechanism are mounted directly on the main chassis. This eliminates the need for additional separate chassis, reducing overall vehicle weight while maintaining high crane capacity for lifting precast members and panels.

Inventive Principle:
Principle #5Merging (Combining)

3Adaptability or versatility

If crane with long boom arm is used, then scanning area is improved, but vehicle height increases

Engineering Contradiction:
Improvescanning areaVSAvoidvehicle height
Core Design Contradiction:
Adaptability or versatilityVSLength of moving object

Solution Approach 1:

The crane boom is designed with dynamic articulation capabilities, allowing it to extend and position loads horizontally without requiring excessive vertical height. The boom can articulate and rotate to achieve broad scanning areas and cover wide working radii while maintaining a compact vehicle profile suitable for tunnel and narrow space operations.

Inventive Principle:
Principle #15Dynamics

4Ease of operation

If operator changes sitting position for rear manoeuvre, then vehicle control is improved, but operation complexity increases

Engineering Contradiction:
Improvevehicle controlVSAvoidoperation complexity
Core Design Contradiction:
Ease of operationVSDevice complexity

Solution Approach 1:

The vehicle control system is segmented into two independent operator cabins, one at the front and one at the rear. Each cabin is equipped with complete control systems, allowing the operator to control vehicle movement and crane operations from either position without needing to physically relocate, thereby simplifying operational procedures.

Inventive Principle:
Principle #1Segmentation

Data Source

PatentEP4143124B1A work machine with double-operator cabin and crane system
Publication Date: 2024.08.07 YAPIRAY DEMIRYOLU INSAAT SISTEMLERI SANAYI & TICARET ANONIM SIRKETI
  • EP4143124B1 patent drawingFigure 1~2
  • EP4143124B1 patent drawingFigure 3~4
  • EP4143124B1 patent drawingFigure 5~6

AI summary

A work machine with double-operator cabin and crane system Invention relates to a work machine a double-operator cabin and crane system used for carrying, lowering and lifting of any materials such as pre-cast panels, railway panels etc. in work sites having restrictions such as tunnel, channel, holes etc. in width and height and showing differences along route due to such restrictions.