Prefabricated Duct Flange for Firestopping Wall Penetrations
Find Innovative SolutionsGenerate Solutions
Solution Overview
Problem
Existing methods for firestopping around air ducts extending through structural panels require staged inspections and separate application of fireproofing materials by skilled personnel and mechanical contractors, complicating the process and increasing costs.
Innovation Solution
A modular prefabricated unit with a structural bracket and pre-installed fireproofing seal that simultaneously maintains spacing and provides firestopping between air ducts and structural panels, allowing mechanical contractors to install both components, eliminating the need for staged inspections and reducing the requirement for specialized fireproofing personnel.
Engineering Contradictions & Design Principles
Engineering Contradiction Analysis
1Reliability
If fireproofing materials are applied into the annulus and then the mechanical bracket is placed, then proper fireproofing can be applied and inspected, but the process requires staged inspections and multiple skilled personnel (fireproofing personnel and mechanical contractors)
Solution Approach 1:
The patent combines the mechanical bracket and fireproofing materials into a single integrated assembly. The bracket includes pre-attached fireproofing materials (mineral wool and intumescent coating) that are applied in advance during manufacturing. This merging eliminates the need for separate fireproofing application and inspection stages, allowing mechanical contractors to install the complete assembly in one step while maintaining fireproofing quality.
Solution Approach 2:
The fireproofing materials are applied to the bracket in advance during manufacturing, before the bracket is installed on-site. The mineral wool is pre-placed in the annulus space and the intumescent coating is pre-applied to the bracket surfaces. This preliminary action transfers the fireproofing work from the installation phase to the manufacturing phase, simplifying the on-site process.
2Measurement precision
If fireproofing is applied and inspected before placing the mechanical bracket, then inspection can be performed, but the annulus becomes hidden by the bracket making subsequent inspection impossible
Solution Approach 1:
The fireproofing materials are applied to the bracket in advance during manufacturing, before the bracket is installed on-site. The mineral wool is pre-placed in the annulus space and the intumescent coating is pre-applied to the bracket surfaces. This preliminary action transfers the fireproofing work from the installation phase to the manufacturing phase, simplifying the on-site process.
Solution Approach 2:
The patent combines the mechanical bracket and fireproofing materials into a single integrated assembly. The bracket includes pre-attached fireproofing materials (mineral wool and intumescent coating) that are applied in advance during manufacturing. This merging eliminates the need for separate fireproofing application and inspection stages, allowing mechanical contractors to install the complete assembly in one step while maintaining fireproofing quality.
3Reliability
If separate fireproofing personnel and mechanical contractors are involved, then proper fireproofing application and mechanical installation can be ensured, but the process time and coordination requirements increase
Solution Approach 1:
The patent combines the mechanical bracket and fireproofing materials into a single integrated assembly. The bracket includes pre-attached fireproofing materials (mineral wool and intumescent coating) that are applied in advance during manufacturing. This merging eliminates the need for separate fireproofing application and inspection stages, allowing mechanical contractors to install the complete assembly in one step while maintaining fireproofing quality.
Solution Approach 2:
The fireproofing materials are applied to the bracket in advance during manufacturing, before the bracket is installed on-site. The mineral wool is pre-placed in the annulus space and the intumescent coating is pre-applied to the bracket surfaces. This preliminary action transfers the fireproofing work from the installation phase to the manufacturing phase, simplifying the on-site process.
Data Source
AI summary
An angular flange for reinforcing and firestopping in the annulus between a structural panel such as a wall, ceiling or floor and a duct extending therethrough. The prefabricated angular flange includes a first flange leg to be secured to the duct and a second flange leg with a sealing member preferably of flexibly resilient foam which could be intumescent attached to a surface of the second leg such that when the first flange leg is secured to the duct the second flange leg can be urged against the structural panel extending therearound with the sealing member positioned between the structural panel and the second flange leg and sealing the annulus.