Dynamic Project File Resource Reallocation System

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current project management systems are inefficient in identifying and mitigating project risks, leading to potential failures due to resource misallocation and lack of real-time monitoring, especially in organizations with overlapping projects and limited resource prioritization.

Innovation Solution

A method and apparatus that identify active and inactive project files, assess project risk metrics, and reallocate resources by simulating resource allocation and deadlines to prevent project failures, using a database to store and compare project attributes and risk metrics.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Measurement precision

If project managers manually track and allocate resources across multiple projects, then they can maintain control over project parameters, but they cannot accurately identify project risks and optimize resource allocation in real-time

Engineering Contradiction:
Improveproject risk identification accuracyVSAvoidresource allocation system complexity
Core Design Contradiction:
Measurement precisionVSDevice complexity

Solution Approach 1:

The patent replaces manual mechanical tracking methods with an automated computer-based system that uses processors and databases to monitor project parameters, allocate resources, and identify risks in real-time, thereby improving measurement precision without proportionally increasing system complexity

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

Solution Approach 2:

The system enables self-service by automatically monitoring project parameters, identifying risks, and reallocating resources without requiring continuous manual intervention from project managers, thus improving risk identification accuracy while reducing operational complexity

Inventive Principle:
Principle #25Self-service

2Reliability

If resources are statically allocated to projects based on initial planning, then resource assignment is simple to manage, but resource misallocation leads to project failures when priorities change

Engineering Contradiction:
Improveproject success rateVSAvoidresource allocation management ease
Core Design Contradiction:
ReliabilityVSEase of operation

Solution Approach 1:

The patent implements dynamic resource allocation where the system continuously monitors project parameters and automatically reallocates resources based on changing priorities and risk levels, improving project success rates while managing complexity through automated decision-making rules

Inventive Principle:
Principle #15Dynamics

Solution Approach 2:

The system incorporates feedback mechanisms by continuously monitoring project parameters, comparing actual performance against targets, and automatically adjusting resource allocation in response to detected risks or changes in project status, thereby improving reliability through adaptive management

Inventive Principle:
Principle #23Feedback

3Loss of information

If project files are updated periodically with static information, then data management is straightforward, but the information becomes unreliable for real-time project monitoring and risk identification

Engineering Contradiction:
Improveproject data accuracyVSAvoidinformation processing efficiency
Core Design Contradiction:
Loss of informationVSProductivity

Solution Approach 1:

The patent implements continuous monitoring of project parameters where the system constantly updates and processes project data in real-time rather than relying on periodic updates, ensuring information accuracy while maintaining processing efficiency through automated continuous data collection and analysis

Inventive Principle:
Principle #20Continuity of useful action

4Reliability

If multiple projects share resources without established rules or priorities, then resource flexibility is high, but project failures increase due to lack of coordination

Engineering Contradiction:
Improveproject completion reliabilityVSAvoidresource sharing flexibility
Core Design Contradiction:
ReliabilityVSAdaptability or versatility

Solution Approach 1:

The patent creates a universal resource allocation system that manages multiple projects through a single integrated platform, establishing automated priority rules and coordination mechanisms that improve project completion reliability while maintaining resource sharing flexibility through centralized intelligent control

Inventive Principle:
Principle #6Universality (Multi-functionality)

Data Source

PatentUS11501226B1Monitoring and creating customized dynamic project files based on enterprise resources
Publication Date: 2022.11.15 WEST TECH GRP LLC
  • US11501226B1 patent drawing
  • US11501226B1 patent drawing
  • US11501226B1 patent drawing

AI summary

One example method of operation may include identifying a plurality of active project files in a database, identifying one or more deliverables included in the plurality of active project files, performing a simulation test based on a current set of allocated resources and a current set of deadlines associated with each of the one or more deliverables to determine whether the one or more deliverables will fail, determining the one or more deliverables includes one or more failed project risk metrics indicating that the one or more deliverables will fail to be completed by a corresponding deadline among the current set of deadlines, selecting one or more of the active project files which does not have a failed project risk metric, and reallocating resources, from the one or more of the active project files which does not have a failed project risk metric, to one or more of the active project files which has one or more failed project risk metrics.