Dynamic Project Activity Prioritization and Object Resizing
Find Innovative SolutionsGenerate Solutions
Solution Overview
Problem
Existing project management software lacks the ability to dynamically modify templates and prioritize activities effectively, leading to inefficiencies in project execution and resource allocation in the construction industry.
Innovation Solution
A computer-implemented method that prioritizes daily project activities based on attributes like early start, total float, and breakability, and allows for resizing of project objects, using a database-driven application platform to optimize activity scheduling and resource allocation.
Engineering Contradictions & Design Principles
Engineering Contradiction Analysis
1Adaptability or versatility
If existing project management software uses manual data input for template modification, then the software can maintain a library of templates, but it lacks the ability to dynamically modify templates
Solution Approach 1:
The patent implements dynamic template modification by allowing project managers to change template parameters (such as activity attributes, scheduling constraints, and resource allocation rules) in real-time based on project needs, transforming static templates into adaptable frameworks that evolve with project requirements
Solution Approach 2:
The system enables modification of template parameters including activity duration, start dates, resource requirements, and scheduling constraints, allowing templates to be customized for different project scenarios without requiring complete template recreation
2Loss of information
If project management software processes multiple daily activities with multiple attributes, then comprehensive project information is available, but prioritizing activities becomes complex and time-consuming
Solution Approach 1:
The system pre-calculates and stores key attributes for each activity (total float, early start, late start, critical path status) before prioritization is needed, so that when daily activity prioritization is required, the system can quickly retrieve and process this pre-prepared information without time-consuming calculations
Solution Approach 2:
The patent applies a systematic prioritization methodology that transforms multiple activity attributes into a unified priority ranking system, converting complex multi-dimensional activity data into actionable priority levels that guide daily project execution
3Manufacturing precision
If project management software provides detailed activity attributes and scheduling information, then scheduling accuracy is improved, but resource allocation efficiency decreases
Solution Approach 1:
The system dynamically adjusts resource allocation based on activity priority rankings derived from detailed scheduling attributes, automatically reassigning resources to high-priority activities while maintaining accurate scheduling information, thus balancing scheduling precision with resource utilization efficiency
Data Source
AI summary
A computer implemented project management application is disclosed. The application can include a method for prioritizing for a current day each respective activity of a plurality of daily activities identified for a project. The application can include a method for resizing a size, shape, or configuration of an object used in a construction project. The application can include a method for selecting activities and resources for a project comprising a plurality of activities and a plurality of resources.