Ecosystem Monitoring System with Deviation-Based Data Filtering

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing systems for managing and monitoring natural ecosystems face challenges in ensuring reliability, transparency, and accessibility of environment data and activity records due to variability in data measurement and lack of visualization and accessibility features.

Innovation Solution

A system comprising an input unit for receiving data, a storage unit for storing data, a processing unit for calculating deviations between management plans and environment data, and an output unit for visualizing and storing or highlighting deviations, improving data reliability, transparency, and accessibility through a management plan-based framework.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Quantity of substance

If environment data is collected from open natural ecology systems, then data quantity and coverage are improved, but data reliability and uniformity deteriorate due to measurement variations

Engineering Contradiction:
Improvedata quantityVSAvoiddata reliability
Core Design Contradiction:
Quantity of substanceVSReliability

Solution Approach 1:

The system implements automated feedback mechanisms where collected environment data is continuously compared against management plan standards. The process unit automatically evaluates whether data meets predetermined criteria and provides feedback to the storage unit for approved data or triggers alerts for deviations, ensuring consistent quality control across large volumes of open-source ecological data

Inventive Principle:
Principle #23Feedback

Solution Approach 2:

The system transforms raw environment data into standardized parameters by applying predetermined evaluation criteria. The process unit converts diverse measurement formats into uniform parameter representations that can be systematically compared against management plans, thereby maintaining reliability while processing large quantities of varied ecological data

Inventive Principle:
Principle #35Parameter changes

2Adaptability or versatility

If manual measurement of environment data is performed, then flexibility in data collection is improved, but measurement uniformity and transparency deteriorate

Engineering Contradiction:
Improvemeasurement flexibilityVSAvoidmeasurement uniformity
Core Design Contradiction:
Adaptability or versatilityVSManufacturing precision

Solution Approach 1:

The process unit serves as an intermediary between manual measurement activities and the central management system. It standardizes measurements by applying predetermined criteria as a mediating framework, ensuring that flexible manual collections from various sources are transformed into uniform, transparent, and comparable data formats before storage or analysis

Inventive Principle:
Principle #24Intermediary (Mediator)

Solution Approach 2:

The system segments the measurement process into distinct standardized stages: data collection, criteria-based evaluation, deviation calculation, and approval/rejection. This segmentation allows manual flexibility in collection while enforcing uniformity through systematic processing steps, with each stage contributing to overall measurement consistency

Inventive Principle:
Principle #1Segmentation

3Reliability

If management plan data is strictly enforced, then data reliability is improved, but system adaptability to natural variations deteriorates

Engineering Contradiction:
Improvedata reliabilityVSAvoidsystem adaptability
Core Design Contradiction:
ReliabilityVSAdaptability or versatility

Solution Approach 1:

The system applies partial enforcement of management plans by implementing a threshold-based approach. Rather than strictly rejecting all deviations, the process unit allows variations within predetermined thresholds to pass through, applying full enforcement only when deviations exceed acceptable limits. This partial action maintains reliability for critical parameters while accommodating natural ecological variations

Inventive Principle:
Principle #16Partial or excessive action

4Quantity of substance

If all environment data is stored and processed, then data completeness is improved, but system complexity and processing burden increase

Engineering Contradiction:
Improvedata completenessVSAvoidsystem complexity
Core Design Contradiction:
Quantity of substanceVSDevice complexity

Solution Approach 1:

The process unit extracts and filters data based on predetermined evaluation criteria before storage. By taking out only the essential evaluation steps (comparing data against criteria, calculating deviations, determining approval status), the system maintains data completeness while removing unnecessary processing complexity, storing only evaluated and categorized results

Inventive Principle:
Principle #2Taking out (Extraction)

Data Source

PatentEP4350590A1System for managing/monitoring natural ecosystem
Publication Date: 2024.04.10 HITACHI LTD
  • EP4350590A1 patent drawingFigure 1
  • EP4350590A1 patent drawingFigure 2
  • EP4350590A1 patent drawingFigure 3

AI summary

In a system for managing/monitoring a natural ecosystem, comprising: an input unit receiving basic information of a target area as an object to be managed or monitored, management or monitoring plan data of an ecosystem in the target area, environment data including measurement data, and ecosystem data; a storage unit storing the input data and process data; a process unit processing data; and an output unit outputting data, the process unit calculates a deviation between the management or monitoring plan data input in the input unit with respect to the target area and the environment data and the ecosystem data, and when the deviation is smaller than a predetermined threshold, stores the environment data and the ecosystem data regarding the target area into the storage unit and, when the deviation is larger than the predetermined threshold, outputs the deviation, and the environment data and the ecosystem data of the target area from the output unit.