Electric Road Machine Charging Display for Planning Long Charge Cycles

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Road construction machines with partial electric drive require longer charging cycles, increasing planning effort and operational complexity due to the need for external charging sources.

Innovation Solution

A road construction machine equipped with an electric drive, a rechargeable battery, a charging device, and a display device that shows the charge state and charging process information in alphanumeric format, allowing operators to better plan and manage charging cycles.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Loss of energy

If an electric drive with rechargeable battery is used in road construction machines, then environmental friendliness and energy efficiency are improved, but charging cycles become longer and operational complexity increases

Engineering Contradiction:
Improveenergy efficiencyVSAvoidoperational complexity
Core Design Contradiction:
Loss of energyVSDevice complexity

Solution Approach 1:

The patent implements a control system that continuously monitors battery charge state, charging process parameters, and machine operational status. This feedback mechanism allows the system to automatically adjust charging strategies, predict charging completion, and provide real-time information to operators, thereby reducing operational complexity while maintaining energy efficiency benefits of electric drive

Inventive Principle:
Principle #23Feedback

2Loss of energy

If an electric drive with rechargeable battery is used in road construction machines, then environmental friendliness and energy efficiency are improved, but charging cycles become longer and planning effort increases

Engineering Contradiction:
Improveenergy efficiencyVSAvoidcharging cycle time
Core Design Contradiction:
Loss of energyVSLoss of time

Solution Approach 1:

The control system performs preliminary actions by predicting charging completion time based on current charge state and charging rate, and by pre-planning optimal charging schedules. This allows operators to better anticipate charging needs and plan machine operations accordingly, reducing the impact of long charging cycles on overall productivity

Inventive Principle:
Principle #10Preliminary action

3Productivity

If detailed information on charging process is provided to operators, then planning efficiency is improved, but information processing requirements increase

Engineering Contradiction:
Improveplanning efficiencyVSAvoidinformation processing
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The control system automatically processes charging information and generates user-friendly displays that show essential charging status, estimated completion time, and operational recommendations. This self-service approach provides operators with actionable information without requiring them to manually process complex technical data, thereby improving planning efficiency while keeping the information system manageable

Inventive Principle:
Principle #25Self-service

Data Source

PatentUS20250115158A1Road construction machine with electric drive
Publication Date: 2025.04.10 JOSEPH VOEGELE AG
  • US20250115158A1 patent drawing
  • US20250115158A1 patent drawing

AI summary

A road construction machine includes an electric drive, a rechargeable battery for supplying the electric drive with electric current, a charging device for connecting the rechargeable battery to an external current source and for charging the rechargeable battery, and a display device for displaying information indicative of a charge state of the rechargeable battery and/or information indicative of a charging process of the rechargeable battery.