Electromigration-Aware Power Rail Placement

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

As feature sizes in chips decrease and functionalities increase, the current densities through wires rise, leading to increased electromigration, which can cause hillocks or voids, resulting in short circuits or open circuits and a decrease in mean time to failure (MTTF).

Innovation Solution

An EM-aware placement method is implemented during the design flow of integrated circuit chips, where the current through each power rail segment is analyzed, and cells with overlapping switching windows are grouped to optimize placement, constraining EM usages to limit electromigration susceptibility, thereby reducing the risk of wire failure.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Adaptability or versatility

If wire size is reduced to increase functionality, then chip functionality increases, but current density increases causing electromigration

Engineering Contradiction:
Improvechip functionalityVSAvoidwire reliability
Core Design Contradiction:
Adaptability or versatilityVSReliability

Solution Approach 1:

The patent applies local quality by differentiating power rail segments based on their electromigration susceptibility and current characteristics. Each segment is evaluated individually with its own EM usage metrics, allowing targeted placement optimization for high-risk segments while maintaining standard placement elsewhere, thus resolving the contradiction between functionality and reliability.

Inventive Principle:
Principle #3Local quality

Solution Approach 2:

The patent performs preliminary action by calculating electromigration usage for each power rail segment before final placement is determined. By pre-evaluating EM susceptibility and constraining placement decisions based on these pre-calculated metrics, the system prevents electromigration issues before they occur, maintaining both high functionality and wire reliability.

Inventive Principle:
Principle #10Preliminary action

2Productivity

If current density increases due to scaling, then chip functionality increases, but electromigration susceptibility increases

Engineering Contradiction:
Improvechip functionalityVSAvoidelectromigration susceptibility
Core Design Contradiction:
ProductivityVSObject-affected harmful factors

Solution Approach 1:

The patent implements feedback by continuously monitoring and calculating EM usage for each power rail segment based on cell placement and current characteristics. This feedback loop allows the placement optimization to adjust cell positions to reduce EM susceptibility while maintaining required functionality, directly addressing the contradiction between productivity and harmful factors.

Inventive Principle:
Principle #23Feedback

Solution Approach 2:

The patent applies parameter changes by modifying placement parameters (cell positions) based on EM usage calculations. When high current density is detected in a region, the system changes placement parameters to redistribute cells and reduce EM susceptibility, thus resolving the contradiction between maintaining chip functionality and reducing electromigration effects.

Inventive Principle:
Principle #35Parameter changes

3Reliability

If placement is optimized for EM usage, then wire reliability increases, but design complexity increases

Engineering Contradiction:
Improvewire reliabilityVSAvoidplacement optimization complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The patent applies segmentation by dividing the power distribution network into discrete power rail segments and evaluating EM usage for each segment independently. This segmentation allows the complex placement optimization problem to be broken down into manageable per-segment evaluations, reducing overall design complexity while maintaining wire reliability.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The patent implements self-service by having the placement optimization system automatically calculate EM usage metrics and adjust placements based on these calculations without requiring manual intervention. This automation reduces design complexity by eliminating manual EM analysis while maintaining high wire reliability through systematic optimization.

Inventive Principle:
Principle #25Self-service

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

This approach optimizes the placement of power rail segments, reducing electromigration-induced failures by accurately managing current densities and extending the mean time to failure of wire connections.

Implementation Method 1

A life span of a wire is subject to electromigration, which is a material transport caused by transfer of momentum between conducting electrons and metal ions

Methodology Applied
Scientific EffectElectromigration:

Data Source

PatentUS9501602B2Electromigration-aware layout generation
Publication Date: 2016.11.22 TAIWAN SEMICONDUCTOR MANUFACTURING CO LTD
  • US9501602B2 patent drawing
  • US9501602B2 patent drawing
  • US9501602B2 patent drawing

AI summary

In some embodiments, in a method, placement of a design layout is performed. The design layout includes a power rail segment, several upper-level power lines and several cells. The upper-level power lines cross over and bound the power rail segment at where the upper-level power lines intersect with the power rail segment. The cells are powered through the power rail segment. For each cell, a respective current through the power rail segment during a respective SW of the cell is obtained. One or more groups of cells with overlapped SWs are determined. One or more EM usages of the power rail segment by the one or more groups of cells using the respective currents of each group of cells are obtained. The design layout is adjusted when any of the one or more EM usages of the power rail segment causes an EM susceptibility of the power rail segment.