Embedded Concrete Anchors for Faster Installation Without Drilling

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current construction methods require drilling into cured concrete to embed fasteners for electrical, plumbing, and other installations, which is time-consuming and can affect the structural integrity of the concrete.

Innovation Solution

A system and methodology using anchor apparatuses embedded in concrete forms before pouring concrete, allowing for precise installation and easy access for supporting construction materials and equipment.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of operation

If fasteners are drilled into cured concrete after construction, then electrical and plumbing installations can be secured, but the installation process becomes time-consuming and labor-intensive

Engineering Contradiction:
Improveease of fastener installationVSAvoidinstallation time
Core Design Contradiction:
Ease of operationVSLoss of time

Solution Approach 1:

The patent applies preliminary action by embedding anchor apparatuses into the concrete during the pouring process rather than drilling into cured concrete later. The anchors are positioned in forms before concrete is poured, allowing them to be set while the concrete is still pliable, which dramatically reduces installation time and effort compared to post-construction drilling.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The patent inverts the conventional sequence by installing anchors before the concrete cures rather than after. Instead of drilling into hardened concrete, the system embeds anchors in the wet concrete, reversing the traditional timeline and making installation significantly easier and faster.

Inventive Principle:
Principle #13The other way round (Inversion)

2Adaptability or versatility

If multiple contractors drill into concrete beams for their respective installations, then all construction supplies can be secured, but the structural integrity of the concrete is compromised

Engineering Contradiction:
Improveaccessibility for multiple contractorsVSAvoidstructural integrity of concrete
Core Design Contradiction:
Adaptability or versatilityVSStrength

Solution Approach 1:

The patent embeds multiple anchor apparatuses during the initial concrete pouring process, allowing all contractors (electrical, plumbing, HVAC) to access pre-positioned anchors without needing to drill into the cured concrete. This preliminary placement of anchors eliminates subsequent drilling operations that would compromise structural integrity.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The patent segments the installation process by providing dedicated anchor points for different contractors (electrical, plumbing, HVAC) at predetermined locations. Each contractor can access their specific anchors without interfering with others' work or requiring additional drilling, thus maintaining concrete integrity while accommodating multiple installation needs.

Inventive Principle:
Principle #1Segmentation

3Reliability

If anchors are embedded in cured concrete, then fastening points are available, but the installation process becomes arduous and time-consuming

Engineering Contradiction:
Improveavailability of fastening pointsVSAvoidinstallation efficiency
Core Design Contradiction:
ReliabilityVSProductivity

Solution Approach 1:

The patent embeds anchor apparatuses during the concrete pouring process when the concrete is still pliable, ensuring reliable fastening points are available while dramatically improving installation efficiency. The anchors are set in place before the concrete cures, eliminating the need for arduous drilling operations into hardened concrete.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS12345060B2Construction anchor apparatus and system and methodology of use
Publication Date: 2025.07.01 ANCHOR RING SOLUTIONS LLC
  • US12345060B2 patent drawing
  • US12345060B2 patent drawing
  • US12345060B2 patent drawing

AI summary

A system, method and apparatus include generating a building model of a building to be constructed at a construction site, identifying within the building model positional locations for installation of one or more anchor apparatuses within structural elements of the building model, transmitting the building model to a portable computing device at the construction site and identifying the location of the portable computing device to a given positional location. At least the generating, identifying, transmitting and identifying steps are implemented via at least one processing device comprising a processor and a memory.