Problem

Existing methods for anchoring concrete panels to foundations involve welding metal connectors or fabricated steel assemblies, which are inefficient and require external bolting, lacking a seamless integration with precast concrete wall panels.

Innovation Solution

A single-piece stamped steel connector is embedded in the concrete wall panel during casting, accompanied by a plastic block-out that forms a void to allow for optimal bolting, ensuring the connector is positioned correctly and accessible for secure attachment to the foundation.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If welding metal connectors between concrete panel and foundation is used, then secure attachment is achieved, but the process becomes complex and time-consuming

Engineering Contradiction:
Improveattachment securityVSAvoidconnection process complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The steel connector is merged with the concrete panel by embedding it during the casting process, creating a unified component. The block-out material is also merged into the connector, forming an integrated assembly that eliminates separate welding operations and simplifies the overall connection system.

Inventive Principle:
Principle #5Merging (Combining)

Solution Approach 2:

The steel connector and block-out are pre-positioned and integrated into the concrete panel during manufacturing before installation. This preliminary action eliminates the need for complex field assembly operations such as welding, reducing both complexity and installation time while maintaining secure attachment.

Inventive Principle:
Principle #10Preliminary action

2Strength

If fabricated steel assemblies are used for embedding, then connection strength is achieved, but manufacturing complexity increases

Engineering Contradiction:
Improveconnection strengthVSAvoidmanufacturing simplicity
Core Design Contradiction:
StrengthVSEase of manufacture

Solution Approach 1:

Multiple components (steel connector, block-out, and concrete) are merged into a single integrated unit during the casting process. This eliminates the need for separate fabrication and assembly operations, simplifying manufacturing while maintaining the structural strength required for secure attachment.

Inventive Principle:
Principle #5Merging (Combining)

Solution Approach 2:

The steel connector and block-out are pre-assembled and positioned within the concrete panel during manufacturing. This preliminary integration simplifies the manufacturing process by eliminating complex field assembly operations while ensuring the connection meets required strength specifications.

Inventive Principle:
Principle #10Preliminary action

3Reliability

If external bolting is used, then attachment is achieved, but installation time increases

Engineering Contradiction:
Improveattachment securityVSAvoidinstallation time
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The steel connector with integrated block-out is pre-positioned and embedded in the concrete panel during manufacturing. This preliminary action eliminates the need for time-consuming field operations such as positioning and welding, allowing for rapid installation while maintaining secure attachment through the pre-configured bolting system.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS20250347104A1Concrete panel bolted foundation connection and method
Publication Date: 2025.11.13 MING KING & ASSOC
  • US20250347104A1 patent drawing
  • US20250347104A1 patent drawing
  • US20250347104A1 patent drawing

AI summary

A steel connector is embedded in the concrete wall panel when the wall is cast. A block-out forms a void in the wall panel and keeps the poured concrete from filling the inside of the steel connector during the casting process. The angle at which the base of the steel connector is disposed within the concrete wall panel provides the proper angle for a fastening bolt to be inserted through the steel connector and into the foundation. The fastening bolt passes the base of the steel connector into the concrete foundation to securely attach the wall panel to the foundation.