Problem

Existing energy management systems face challenges in consistently meeting North American Electric Reliability Corporation (NERC) mandated control performance standards, particularly with compliance violations due to the integration of short-term and long-term control mechanisms, which can lead to frequency and interchange errors.

Innovation Solution

An energy management system that determines a comprehensive control performance standard (CPS) green zone, enabling automatic generation control (AGC) to operate within this zone, incorporating predictive CPS control and load frequency control to optimize control actions and maintain compliance with NERC standards, thereby reducing the likelihood of violations.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If automatic generation control operates without predictive control, then system simplicity is maintained, but frequency and interchange errors increase leading to CPS violations

Engineering Contradiction:
Improvefrequency and interchange control accuracyVSAvoidcontrol system complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The predictive control component forecasts future frequency and interchange conditions based on historical data and system trends. By taking preliminary action to anticipate deviations before they occur, the system can proactively adjust generation output to prevent CPS violations, improving control accuracy without requiring complex real-time intervention mechanisms.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system continuously monitors actual frequency and interchange measurements and compares them against predicted values and CPS thresholds. This feedback loop enables the predictive controller to learn from past performance and refine future predictions, maintaining high reliability while managing complexity through adaptive rather than purely reactive control.

Inventive Principle:
Principle #23Feedback

2Reliability

If comprehensive CPS green zone control is implemented, then compliance with NERC standards is ensured, but control system complexity increases

Engineering Contradiction:
ImproveCPS compliance assuranceVSAvoidcontrol system structure
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The control area is divided into multiple control zones, each with its own controller that independently maintains frequency and interchange within specified ranges. This segmentation allows each zone to be optimized separately, preventing the compliance violations that occur when integrating short-term and long-term control mechanisms across the entire control area.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The predictive control component forecasts future frequency and interchange conditions based on historical data and system trends. By taking preliminary action to anticipate deviations before they occur, the system can proactively adjust generation output to prevent CPS violations, improving control accuracy without requiring complex real-time intervention mechanisms.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS10359776B2Systems, apparatus, and methods for automatic generation control based on comprehensive control performance standard green zone control
Publication Date: 2019.07.23 SIEMENS INDUSTRY INC
  • US10359776B2 patent drawing
  • US10359776B2 patent drawing
  • US10359776B2 patent drawing

AI summary

Embodiments provide systems, apparatus, and methods for power distribution operated under automatic generation control (AGC) based on comprehensive control performance standard (CPS) green zone control. Embodiments include a plurality of power generating resources operating within a control area; a plurality of power consuming loads; a power transmission network coupling the resources to the loads; and an energy management system (EMS) in communication with the resources and configured to control operation of the resources within the control area. The EMS is operative to: determine a control performance standard (CPS) green zone; operate an automatic generation control (AGC) system of the EMS in the determined CPS green zone; and output electricity to the loads from the resources under the control of the AGC of the EMS operating in the green zone. Numerous additional aspects are disclosed.