Field Machine Work Assistance Using Engine Load Event Estimation

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing work assistance systems for machines traveling in fields do not adequately address events like machine sinking, which can hinder work, by failing to consider measures such as increasing engine RPM.

Innovation Solution

A work assistance system that includes an estimation unit to predict the occurrence of events like machine sinking based on engine load changes, and an output unit to provide data for taking preventive measures, such as increasing engine RPM.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If existing work assistance systems only provide basic operational advice, then system complexity is reduced, but the ability to prevent work-hindering events like machine sinking is insufficient

Engineering Contradiction:
Improveability to prevent work-hindering eventsVSAvoidsystem complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The estimation unit performs preliminary assessment of sinking risk based on current engine load and historical data before the machine actually sinks. This allows preventive measures to be taken in advance, improving reliability without requiring complex real-time intervention systems.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system continuously monitors engine load and compares it with historical data to provide feedback on sinking risk. This feedback mechanism enables the system to adaptively adjust operational advice, enhancing reliability through data-driven decision making while maintaining manageable system complexity.

Inventive Principle:
Principle #23Feedback

2Loss of information

If the system provides detailed real-time monitoring and estimation functions, then work assistance effectiveness is improved, but information processing requirements increase

Engineering Contradiction:
Improveinformation completeness for work assistanceVSAvoiddata processing load
Core Design Contradiction:
Loss of informationVSQuantity of substance

Solution Approach 1:

The system extracts only the most critical parameters (engine load, position, historical sinking data) from the available data stream, processing only what is necessary for accurate sinking risk estimation. This reduces information processing requirements while maintaining complete information for effective work assistance.

Inventive Principle:
Principle #2Taking out (Extraction)

Solution Approach 2:

The estimated sinking risk information serves multiple purposes: it guides operational adjustments, informs maintenance scheduling, and provides predictive analytics. This multi-functionality maximizes the value of processed information, reducing the need for separate data processing systems.

Inventive Principle:
Principle #6Universality (Multi-functionality)

Data Source

PatentUS12290015B2Work assistance system, work system, work assistance method, and program
Publication Date: 2025.05.06 YANMAR POWER TECH CO LTD
  • US12290015B2 patent drawing
  • US12290015B2 patent drawing
  • US12290015B2 patent drawing

AI summary

A work assistance system is a system used together with a work machine, wherein an estimation unit and an output unit are provided. The work machine has an engine as the power source thereof, and travels in a field. On the basis of at least the magnitude of the load of the engine, the estimation unit estimates whether there is an occurrence of a target event that accompanies fluctuations in the load. The output unit outputs output data corresponding to the estimation results from the estimation unit.