Problem

Current systems for managing environment-related data lack a centralized point of truth, continuity during ownership transfers, data transparency regarding risk impacts, and real-time updates, failing to accurately determine the impact of degradation or deferred maintenance on environment values.

Innovation Solution

A centralized and dynamically updatable system for monitoring data, which improves alert impact data generation even with limited data availability, enabling different views based on user roles and providing access to various data insights throughout the ownership lifecycle, including acquirer, maintainer, and divester views.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Loss of information

If data aggregation is centralized, then data transparency and real-time updates are improved, but system complexity and integration requirements increase

Engineering Contradiction:
Improvedata transparencyVSAvoidsystem complexity
Core Design Contradiction:
Loss of informationVSDevice complexity

Solution Approach 1:

The patent introduces a data model as an intermediary layer between disparate data sources and users. This data model acts as a mediator that standardizes environmental data from multiple sources, transforming them into a unified structure that can be consistently queried and visualized, thereby achieving transparency without requiring complex direct integration between all systems

Inventive Principle:
Principle #24Intermediary (Mediator)

Solution Approach 2:

The system segments data management into distinct components: data collection from various sources, data modeling/standardization, data storage, and data visualization. This segmentation allows each component to be optimized independently and reduces the complexity of integrating all data sources while maintaining centralized access

Inventive Principle:
Principle #1Segmentation

2Measurement precision

If real-time data monitoring is implemented, then data freshness and accuracy are improved, but computational resources and processing complexity increase

Engineering Contradiction:
Improvedata accuracyVSAvoidcomputational resources
Core Design Contradiction:
Measurement precisionVSUse of energy by moving object

Solution Approach 1:

The patent applies preliminary action by pre-defining the data model structure, field types, and relationships before data ingestion. This allows incoming data to be rapidly validated and transformed according to predetermined schemas, reducing real-time processing complexity while maintaining accuracy

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system changes parameters by transforming diverse data formats into a standardized internal representation defined by the data model. This parameter transformation enables efficient storage and retrieval while maintaining data accuracy, reducing the computational burden of handling multiple data formats simultaneously

Inventive Principle:
Principle #35Parameter changes

3Adaptability or versatility

If multiple data views for different users are provided, then user-specific information access is improved, but data structure complexity and access layer complexity increase

Engineering Contradiction:
Improveuser role adaptabilityVSAvoidaccess layer complexity
Core Design Contradiction:
Adaptability or versatilityVSDevice complexity

Solution Approach 1:

The patent implements universality by designing a single, unified data model that serves multiple user roles and purposes. The same standardized data structure provides information for acquirers, maintainers, and divesters respectively, eliminating the need for separate data structures for each user type while maintaining role-specific access capabilities

Inventive Principle:
Principle #6Universality (Multi-functionality)

Data Source

PatentUS20240070338A1Apparatuses, computer-implemented methods, and computer program products for modeling environment-related data from real-time data alerts
Publication Date: 2024.02.29 HONEYWELL INTERNATIONAL INC
  • US20240070338A1 patent drawing
  • US20240070338A1 patent drawing
  • US20240070338A1 patent drawing

AI summary

Embodiments of the present disclosure receive and process various monitored data, including real-time monitored data and/or non-real-time monitored data, to generate alert impact data associated with one or more environments. Some embodiments receive, at least one alert associated with operation of an environment, the at least one alert determined based at least in part on real-time monitored data captured via at least one system in the environment; apply the at least one alert to a model that determines alert impact data based at least in part on the at least one alert; determine environment value data based at least in part on the alert impact data; and output at least the environment value data.