ESP Transport Basket Structure for In-Assembly Testing
Find Innovative SolutionsGenerate Solutions
Solution Overview
Problem
Wellbore servicing tools, such as components of an electrical submersible pump assembly, are prone to damage during transport and require extensive testing and maintenance, which is time-consuming and labor-intensive, increasing the risk of further damage and delays.
Innovation Solution
A transport assembly comprising a reinforced transport basket with clamps, lift supports, and braces that securely holds and supports ESP components, allowing for efficient testing and preparation while minimizing damage, and enabling safe handling and stacking for transport.
Engineering Contradictions & Design Principles
Engineering Contradiction Analysis
1Reliability
If ESP components are transported without a reinforced transport assembly, then transport simplicity is maintained, but damage risk to components increases
Solution Approach 1:
The transport assembly is divided into modular components including a transport basket, braces, clamps, and lift supports that can be independently configured and assembled based on specific component protection needs
Solution Approach 2:
The reinforced transport assembly provides pre-established structural protection through braces and clamps before components are subjected to transport stresses, preventing damage rather than remedying it after occurrence
2Reliability
If ESP components are lifted and handled multiple times for testing and maintenance, then thorough inspection is achieved, but time consumption and labor requirements increase
Solution Approach 1:
Multiple functions including transport, support during testing, and maintenance positioning are merged into a single integrated transport assembly, eliminating the need for separate handling operations for each function
Solution Approach 2:
The transport assembly serves multiple purposes: transporting components to the wellsite, providing structural support during testing, and facilitating maintenance operations, thereby reducing overall time and labor requirements
3Reliability
If multiple field service crew members are deployed for component handling, then safe operation is ensured, but labor costs and operational complexity increase
Solution Approach 1:
The lift supports enable dynamic height adjustment of the transport basket, allowing single operator control of heavy components through mechanical advantage rather than requiring multiple workers for manual handling
Data Source
AI summary
A method of testing an electrical submersible pump (ESP) component may include placing an ESP component in a transport assembly at a first location for transport to a second location. The ESP component may be tested or maintained while the ESP component remains in the transport assembly, before being deployed at a wellsite. The ESP components can be prepared in the transport assembly to be lifted (including placement of lifting clamps) to run in hole. In various embodiment, the transport assembly may comprise the ESP component and a transport basket configured for stacking multiple transport assemblies.