Problem

Microgrids connected to electric vehicle supply equipment face instability due to high demand for vehicle charging, which existing methods fail to address effectively without compromising user convenience or causing power network instability.

Innovation Solution

A server manages power adjustment resources by determining if the power network reserve is sufficient before allowing vehicle charging, using power adjustment resources to respond to charging demands, and implementing different permission levels for charging to balance supply and demand while maintaining user convenience.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If vehicle charging is restricted to maintain power network stability, then power network stability is improved, but user convenience is worsened

Engineering Contradiction:
Improvepower network stabilityVSAvoiduser convenience
Core Design Contradiction:
ReliabilityVSEase of operation

Solution Approach 1:

The server performs preliminary determination of power network reserve before allowing vehicle charging to start. The first determination unit checks if reserve meets the first reference value in advance, and the second determination unit checks if power adjustment resources can respond in advance. This preliminary assessment ensures charging only begins when the network can handle the load, maintaining stability while enabling user convenience.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The server acts as an intermediary between the power network and vehicle charging systems. It manages the interaction by determining whether charging requests should be permitted based on real-time power network conditions and power adjustment resource availability, thus mediating between network stability requirements and user charging needs.

Inventive Principle:
Principle #24Intermediary (Mediator)

2Ease of operation

If vehicle charging is permitted without restriction, then user convenience is improved, but power network stability is worsened

Engineering Contradiction:
Improveuser convenienceVSAvoidpower network stability
Core Design Contradiction:
Ease of operationVSReliability

Solution Approach 1:

The server continuously monitors power network reserve and power adjustment resource status, using this feedback to dynamically determine whether to permit or restrict vehicle charging. This feedback mechanism ensures charging permissions are granted only when network conditions are favorable, preventing instability while maintaining user convenience.

Inventive Principle:
Principle #23Feedback

3Reliability

If power adjustment resources are activated to respond to charging demand, then power network stability is improved, but system complexity is worsened

Engineering Contradiction:
Improvepower network stabilityVSAvoidsystem complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

Power adjustment resources are designed to serve multiple functions: they can respond to vehicle charging demands, provide frequency regulation, and offer voltage support. By making these resources multi-functional, the system achieves improved stability without proportionally increasing complexity, as the same resources address multiple power network needs.

Inventive Principle:
Principle #6Universality (Multi-functionality)

Data Source

PatentUS12024043B2Server and power management method
Publication Date: 2024.07.02 TOYOTA JIDOSHA KK
  • US12024043B2 patent drawing
  • US12024043B2 patent drawing
  • US12024043B2 patent drawing

AI summary

Before start of vehicle charging by using a power network, a first determination unit determines whether reserve of the power network is not less than a first reference value. When reserve of the power network is not less than the first reference value, a first permission unit permits supply of electric power from the power network to a vehicle. When reserve of the power network is smaller than the first reference value, a second determination unit determines whether or not electric power corresponding to charging power can be supplied to the power network by having at least one of power adjustment resources respond to vehicle charging. When the second determination unit determines that electric power can be supplied, a second permission unit permits supply of electric power from the power network to the vehicle.