Problem

Excavation buckets, particularly larger ones, face weakness and failure due to fatigue stress at weld joins between assembled pieces, which are prone to cracking, especially in the ground engaging lip.

Innovation Solution

The design incorporates members with thicker portions forward of thinner ones, featuring recesses and weakened regions that deform under load to relieve stress, and wear members with wrapping portions and legs that fit into recesses to protect edges and reduce wear, enhancing joint strength and durability.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of manufacture

If excavation buckets are constructed from separately formed pieces welded together, then ease of manufacture is improved, but strength and reliability deteriorate due to weld joins being prone to cracking and fatigue failure

Engineering Contradiction:
Core Design Contradiction:
Ease of manufactureVSStrength

Solution Approach 1:

The bucket is divided into separately formed pieces (sides, bottom, lip) that are assembled together, allowing easier manufacturing of each component while maintaining overall structural integrity through careful design of joint regions with varying thickness

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The bucket members feature varying thickness throughout their structure, with thicker sections at critical stress areas (such as near weld joins and the lip) and thinner sections where less strength is required, optimizing both strength and weight

Inventive Principle:
Principle #3Local quality

2Ease of manufacture

If excavation buckets are constructed from separately formed pieces welded together, then ease of manufacture is improved, but reliability deteriorates due to fatigue stress causing weld join failure

Engineering Contradiction:
Core Design Contradiction:
Ease of manufactureVSReliability

Solution Approach 1:

The bucket is divided into separately formed pieces that are assembled together, allowing easier manufacturing of each component while maintaining overall structural integrity through careful design of joint regions

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The design incorporates thicker sections at critical stress areas before fatigue damage can occur, providing a margin of safety and allowing for fatigue crack initiation without immediate failure, thereby improving reliability

Inventive Principle:
Principle #11Beforehand cushioning (Prior cushioning)

3Strength

If thicker portions are added to members to increase joint strength, then strength is improved, but weight increases excessively

Engineering Contradiction:
Core Design Contradiction:
StrengthVSWeight of moving object

Solution Approach 1:

The bucket members feature varying thickness throughout their structure, with thicker sections at critical stress areas and thinner sections where less strength is required, optimizing both strength and weight

Inventive Principle:
Principle #3Local quality

Solution Approach 2:

Instead of uniformly increasing thickness throughout the members, the design varies thickness in specific locations and dimensions, adding material only where structurally necessary to improve joint strength without excessive weight gain

Inventive Principle:
Principle #17Another dimension (Dimensionality change)

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

This design increases the strength of joints without excessive weight, reduces the likelihood of cracking, and protects edges from wear, thereby enhancing the durability and performance of excavation buckets.

Implementation Method 1

a weakened region that is arranged to preferentially deform under load so as to relieve loading in the excavator bucket joint

Methodology Applied
Scientific EffectStress relaxation: Stress Relaxation

Implementation Method 2

wear members with wrapping portions and legs that fit into recesses to protect edges and reduce wear

Methodology Applied
Scientific EffectWear resistance: Wear

Data Source

PatentUS9903092B2Excavation bucket
Publication Date: 2018.02.27
  • US9903092B2 patent drawing
  • US9903092B2 patent drawing
  • US9903092B2 patent drawing

AI summary

A member for assembly with other members in an assembled condition to form an excavation bucket, the member forming at least part of one of the walls of the bucket when in its assembled condition, the member comprising a body having a forward edge; a rearward edge; opposite inner and outer surfaces that extend between the edges; a first portion of the member being thicker between its inner and outer surfaces than a second portion of the member, the first portion being disposed forward of the second portion.