Problem

Current wind turbine repair procedures are labor-intensive and challenging due to limited working space within the nacelle, requiring the turbine head to be removed and transported for maintenance, which is time-consuming and hazardous, especially when repairs are performed uptower.

Innovation Solution

An external platform assembly is mounted to the front of the nacelle, providing a secure working surface for personnel during repairs, with a platform frame, access assembly, and adjustable cover for safety and protection, allowing for safe access and operation outside the nacelle.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of operation

If repair procedures are performed within the nacelle, then personnel have access to components, but the working space is minimal and difficult to operate

Engineering Contradiction:
Improveworking space for personnelVSAvoidnacelle structure
Core Design Contradiction:
Ease of operationVSDevice complexity

Solution Approach 1:

The patent extends the working space from the two-dimensional interior of the nacelle to a three-dimensional external platform mounted on the nacelle exterior. This external platform provides personnel with adequate working space while maintaining the compact nacelle structure, effectively adding a new spatial dimension for repair operations.

Inventive Principle:
Principle #17Another dimension (Dimensionality change)

2Ease of repair

If the turbine head is removed and transported to a manufacturing facility for repair, then repairs can be performed on removed components, but the process is very time-consuming and labor intensive

Engineering Contradiction:
Improveaccess to components for repairVSAvoidtime for removal and transport
Core Design Contradiction:
Ease of repairVSLoss of time

Solution Approach 1:

The patent extracts only the necessary repair functions from the manufacturing facility context and brings them to the turbine site through the external platform. This allows repair activities to be performed in-situ on the turbine head without complete removal and transport, significantly reducing time loss while maintaining repair capability.

Inventive Principle:
Principle #2Taking out (Extraction)

Solution Approach 2:

The external platform is pre-configured with necessary repair equipment, tools, and safety features before repair operations begin. This preliminary preparation eliminates the need for time-consuming setup during actual repair operations and avoids the need to transport components to a facility with pre-existing repair capabilities.

Inventive Principle:
Principle #10Preliminary action

3Productivity

If the turbine head remains mounted uptower, then operational continuity is maintained, but repair procedures become more hazardous

Engineering Contradiction:
Improveoperational continuityVSAvoidhazards during repair
Core Design Contradiction:
ProductivityVSObject-affected harmful factors

Solution Approach 1:

The external platform serves as an intermediary structure between the turbine head and the ground-based support equipment. It provides a stable, safe working environment for personnel while the turbine head remains mounted uptower, mediating the hazards by creating a protected workspace with proper safety railings, access points, and equipment support.

Inventive Principle:
Principle #24Intermediary (Mediator)

4Ease of operation

If an external platform is added to the nacelle, then working space and safety are improved, but the device complexity increases

Engineering Contradiction:
Improveworking surface for personnelVSAvoidplatform assembly structure
Core Design Contradiction:
Ease of operationVSDevice complexity

Solution Approach 1:

The external platform is designed as a segmented, modular structure that can be assembled from discrete components. This segmentation reduces overall complexity by allowing each module to be independently designed, manufactured, and installed, while collectively providing the necessary working surface and safety features.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The external platform is designed with multi-functional elements that perform multiple purposes: structural support for personnel, mounting for repair equipment, safety railings, and access ladders. This universality reduces the number of separate components needed, thereby reducing overall device complexity while maintaining comprehensive functionality.

Inventive Principle:
Principle #6Universality (Multi-functionality)

Data Source

PatentEP3431757B1External platform assembly for wind turbine repairs
Publication Date: 2020.06.10 GENERAL ELECTRIC CO
  • EP3431757B1 patent drawingFigure 1
  • EP3431757B1 patent drawingFigure 2
  • EP3431757B1 patent drawingFigure 3

AI summary

A disassembled wind turbine 10 under repair includes a tower 12 secured to a foundation 14 and a nacelle 16 mounted atop the tower 12. The nacelle 16 includes a base wall 17, side walls 19, a front wall 21, a rear wall 23, and a top wall 25. The front wall 21 includes an opening 27 configured to receive a main shaft 34 of the wind turbine 10; however, the main shaft 34 and a rotor 18 of the wind turbine 10 have been removed from the nacelle 16 during a repair procedure. As such, the disassembled wind turbine 10 further includes an external platform assembly 50 secured at the opening 27 of the front wall 21 of the nacelle 16 during the repair procedure.