Problem

The commissioning and decommissioning of field devices in industrial control systems are complex and time-consuming due to the presence of mismatched, uninitialized, and initialized states, especially when dealing with multiple devices from different manufacturers with varying operational capabilities and programming.

Innovation Solution

A system and method that includes a graphical user interface (GUI) and software tools for efficiently commissioning and decommissioning field devices by transitioning them between states, including a mismatched, uninitialized, and commissioned state, using permanent and temporary node IDs and tags, and providing wizards to guide users through the process, allowing for commissioning without physically disconnecting devices when temporary node limits are reached.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If commissioning and decommissioning processes are performed manually for each field device, then device management can be completed, but the process becomes complex and time-consuming

Engineering Contradiction:
Improvecommissioning speedVSAvoidcommissioning process complexity
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The commissioning system automatically detects field devices and performs commissioning operations without requiring manual intervention for each device. The system self-configures by detecting device states, assigning node IDs, and transitioning devices through commissioning stages autonomously, thereby increasing productivity while managing complexity.

Inventive Principle:
Principle #25Self-service

Solution Approach 2:

The system manages device commissioning by changing key parameters such as node IDs, device states, and configuration data. By systematically managing these parameter transitions, the system streamlines the commissioning process, making it faster and less complex while maintaining proper device integration.

Inventive Principle:
Principle #35Parameter changes

2Adaptability or versatility

If multiple field devices from different manufacturers are integrated, then system functionality is enhanced, but commissioning complexity increases due to varying operational capabilities and programming

Engineering Contradiction:
Improvedevice compatibilityVSAvoidcommissioning process complexity
Core Design Contradiction:
Adaptability or versatilityVSDevice complexity

Solution Approach 1:

The commissioning system is designed to universally handle multiple field devices from different manufacturers by implementing a standardized commissioning approach. It can detect and manage various device types (I/O devices, control devices, smart devices) through common protocols and interfaces, enabling diverse device integration without proportionally increasing commissioning complexity.

Inventive Principle:
Principle #6Universality (Multi-functionality)

Solution Approach 2:

The commissioning system acts as an intermediary between field devices and the control system, providing a standardized interface that abstracts away manufacturer-specific variations. This mediator layer handles device detection, state management, and configuration in a unified manner, allowing diverse devices to be integrated without directly exposing their individual complexities.

Inventive Principle:
Principle #24Intermediary (Mediator)

3Reliability

If temporary node limits are reached during commissioning, then system resource constraints are enforced, but device commissioning cannot be completed

Engineering Contradiction:
Improvesystem resource managementVSAvoidcommissioning completion rate
Core Design Contradiction:
ReliabilityVSProductivity

Solution Approach 1:

The system dynamically manages node ID allocation by transitioning from static temporary node assignments to dynamic permanent node assignments. When temporary node limits are reached, the system automatically progresses devices to permanent node assignment, allowing commissioning to continue while maintaining proper resource management through state transitions.

Inventive Principle:
Principle #15Dynamics

Solution Approach 2:

The system performs preliminary device detection and state assessment before final commissioning. By identifying devices that need commissioning and preparing their configuration in advance, the system can efficiently allocate permanent node IDs when temporary nodes are exhausted, ensuring commissioning completion without violating resource constraints.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS9052708B2Systems and methods for improved device commissioning and decommissioning
Publication Date: 2015.06.09 GE INFRASTRUCTURE TECH LLC
  • US9052708B2 patent drawing
  • US9052708B2 patent drawing
  • US9052708B2 patent drawing

AI summary

The embodiments described herein include a system and a method. In one embodiment, a system includes a commissioning system configured to operatively couple a field device to a control system. The system further includes a decommissioning system configured to operatively uncouple the field device from the control system. The system additionally includes a graphical user interface (GUI) configured to use the commissioning system, the decommissioning system, or a combination thereof, to operatively couple the field device to the control system, operatively uncouple the field device to the control system, or a combination thereof, by using a plurality of field device states comprising a mismatched state and a commissioned state, wherein the commissioning system is configured to transition the field device from the mismatched state into the commissioned state if the field device is determined to be in the mismatched state.