Floor and ceiling panel for use in buildings

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Conventional construction methods are time-consuming and prone to waste and installation imperfections due to the linear sequence of activities by different trades, leading to cost overruns in building projects, especially in multi-unit buildings.

Innovation Solution

The development of pre-assembled floor and ceiling panels that include a frame, joists, a corrugated form deck, sound dampeners, and an in-floor radiant heat member, allowing for off-site assembly and efficient on-site installation, which supports uniform heating and reduces sound transmission.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If conventional construction methods are used with linear sequence of activities by different trades, then each trade can perform their specialized tasks, but the construction process becomes time-consuming and prone to waste and installation imperfections

Engineering Contradiction:
Improveconstruction efficiencyVSAvoidconstruction time
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

The patent applies preliminary action by pre-assembling floor and ceiling panels in a factory setting before transporting them to the construction site. The panels are manufactured with integrated components including joists, subflooring, ceiling materials, insulation, and utility conduits already in place, eliminating the need for sequential on-site assembly by multiple trades and significantly reducing construction time.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The patent merges multiple construction elements into a single integrated panel system. Floor joists, subflooring, ceiling panels, insulation material, and utility conduits are combined into one pre-assembled unit that functions as both floor and ceiling structure, reducing the number of separate installation steps and improving overall construction efficiency.

Inventive Principle:
Principle #5Merging (Combining)

2Ease of manufacture

If conventional construction methods are used with multiple trades working sequentially, then each trade can install their components, but installation imperfections and waste increase

Engineering Contradiction:
Improveinstallation easeVSAvoidinstallation precision
Core Design Contradiction:
Ease of manufactureVSManufacturing precision

Solution Approach 1:

The panel system performs preliminary assembly in a controlled factory environment where precision installation can be ensured. All components are pre-positioned and secured with appropriate fasteners and connections before shipping, guaranteeing installation precision that would be difficult to achieve through sequential on-site assembly by multiple trades.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The integrated panel serves multiple functions simultaneously - structural support, flooring, ceiling, insulation, and utility routing - all achieved through a single installation process. This multi-functionality eliminates the need for multiple specialized trades and reduces the risk of installation imperfections associated with coordinating multiple contractors.

Inventive Principle:
Principle #6Universality (Multi-functionality)

3Productivity

If pre-assembled floor and ceiling panels are used, then construction time is reduced and waste is minimized, but the complexity of panel design and assembly increases

Engineering Contradiction:
Improveconstruction speedVSAvoidpanel design complexity
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The building system is segmented into standardized modular panels that can be manufactured independently and assembled systematically on-site. Each panel is a self-contained unit with defined dimensions and integrated components, allowing for simplified production processes and easier quality control despite the complexity of the integrated design.

Inventive Principle:
Principle #1Segmentation

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

This solution streamlines the construction process, reduces waste and installation errors, and provides uniform heating while meeting sound and structural requirements, thereby enhancing efficiency and reducing costs in building projects.

Implementation Method 1

an in-floor radiant heat member disposed between the corrugated form deck and the ceiling substrate

Methodology Applied
Scientific EffectRadiant heating: Thermal Radiation

Data Source

PatentEP3186561B1Floor and ceiling panel for use in buildings
Publication Date: 2020.11.25 INNOVATIVE BUILDING TECHNOLOGIES LLC
  • EP3186561B1 patent drawingFigure 1
  • EP3186561B1 patent drawingFigure 2
  • EP3186561B1 patent drawingFigure 3

AI summary

Floor and ceiling panels and methods of constructing a floor system for a building are described. In some embodiments, a panel includes a plurality of joists, a corrugated form deck disposed above and attached to the plurality of joists, a ceiling substrate disposed below and attached to the plurality of joists, and an in-floor radiant heat member disposed between the corrugated form deck and the ceiling substrate. In some embodiments, the panel includes a plurality of joists, a corrugated form deck disposed above and attached to the plurality of joists, and a sound dampener disposed between the corrugated form deck and the plurality of joists. In some embodiments, the method includes attaching a pre-assembled panel to a frame of the building and pouring concrete onto the panel so that a radiant heat member is separated from the concrete by a corrugated form deck of the panel.